My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 4:58:58 PM
Creation date
12/6/2019 2:58:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department D1118CTOR <br /> �" ?•' -=�� 9 Donna Heran,REHS <br /> ra i 1868 fast Hazelton Avenue <br /> y; Stockton, California 95205.6232 PROGRAM COORDINATORS <br /> t 4 Robert McClelbn,REHS <br /> Jeff Carruesco,RENS,RDI <br /> .r c•.. p • Kesey Foley,REHS <br /> Q�+so iil Website:www.sJgov.org/ehd Linda Turkette,REHS <br /> Phone: (209)468-3420 <br /> Fax: (209)464-0138 <br /> December 26, 2012 <br /> Mr. Jerry Moore <br /> Moore Petroleum <br /> .. 885 Portofino Drive <br /> Brentwood, California 94513-6539 <br /> Subject: Former Moore Petroleum Bulk Plant <br /> 5491 F Street <br /> Banta, California 9530 <br /> Dear Mr. Moore: <br /> The San Joaquin County Environmental Health Department (END) has received a No Further <br /> r„ Action Required Concurrence letter from the Central Valley Regional Water Quality Control <br /> Board (CVRWQCB), dated 12 December 2012, for the above-referenced site; and the EHD has <br /> reviewed Well Destruction Work Plan (work plan) dated 16 July 2012, submitted by your <br /> consulting firm, Apex Envirotech, Inc. (Apex) on your behalf. <br /> In the work plan, Apex proposes to destroy eleven monitoring wells (MW-1, MW-2, MW-4A, <br /> MW-5, MW-6, MW-9, MW-12 through MW-14, MW-16 and MW-17), and ten ozone sparging <br /> .r wells(OS-1 through OS-10) by pressure grouting. Apex proposes to use a tremie pipe to grout <br /> to the surface with portland cement slurry followed by applying 25 pounds per square inch (psi) <br /> of pressure for a minimum of five minutes, and then Apex over-drilling the top five feet and <br /> backfilling the hole with portland cement slurry to within a foot of the ground surface. <br /> Apex also proposes to destroy five monitoring wells (MW-3, MW-10, MW-11, MW-15 and MW- <br /> 18), two monitoring/vapor extraction wells (MW-7NEW-4 and MW-8NEW-3), two vapor <br /> extraction wells (VEW-1 and VEW-2), and one recovery well (RW-2) by over-drilling the wells to <br /> .r total depth using augers with diameters equal to or greater than the augers used to install the <br /> wells; then, Apex proposes to grout the borehole with portland cement slurry using a tremie <br /> pipe. <br /> The EHD has reviewed the historical soil and groundwater analytical data for this site. Based <br /> on the presence of petroleum hydrocarbon contamination in soil samples collected at the time of <br /> well installation, or the location of the well near known or suspected contamination, or the <br /> detection of contaminants of concern in relatively recent groundwater samples collected at the <br /> site, the EHD approves the following: <br /> r <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.