Laserfiche WebLink
Well Destruction Results Report <br /> r+ Moore Petroleum Bulk Plant,5491 `F'Street,Banta,California `� <br /> Page 5 <br /> model (SCM), soil vapor survey workplan, ozone efficiency letter, and TPHmo definition letter <br /> be prepared. <br /> May 9, 2007—Apex submitted a Soil Vapor Survey Workplan to investigate the presence or <br /> absence of fugitive soil vapors in the shallow subsurface. <br /> May 16, 2007—Apex submitted a letter to the SJCEHD for defining the suspected TPHmo <br /> plume discovered in borings CPT-1 and CPT-2. Apex suggested additional testing of the Rhodes <br /> water well for TPHd, TPHmo, and total petroleum hydrocarbons as kerosene (TPHk). Apex also <br /> suggested installing MW-15 to a depth of 100 feet below ground surface (bgs). The SJCEHD <br /> approved the additional testing but requested additional information before approving the <br /> installation change to well MW-15. <br /> V <br /> May 24, 2007—Apex submitted a response letter to the SJCEHD, providing justification for the <br /> current onsite ozone system. <br /> 1�1 <br /> June 25, 2007—The SJCEHD issued a letter requesting clarification of the soil vapor survey on <br /> May 9, 2007. Apex submitted a Soil Vapor Survey Workplan Clarification, dated July 24, 2007, <br /> to address the SJCEHD's concerns. <br /> June 29, 2007—Apex issued a letter to the SJCEHD, suggesting that additional sampling be <br /> performed in the area around CPT-2 to confirm the presence of weed oil 30 feet bgs. Apex also <br /> recommended that proposed well MW-15 be installed to the original depth of 20 feet bgs. <br /> October 31, 2007—Apex advanced and sampled 13 soil vapor points at the subject site. Results <br /> of the soil vapor survey are documented in Apex's Soil Vapor Survey Results Report, dated <br /> December 12, 2007. <br /> March 12, 2008 —The SJCEHD issued a letter requesting a fate analysis of proposed sample <br /> analyte list(dinitro amyl phenol (DAP), dinitro butyl phenol (DBP), 2-sec, 4-butyl dinitrophenol <br /> (dinoseb), and pentachlorophenol (PCP). The SJCEHD also approved the installation of well <br /> MW-15 to the originally proposed depth of 20 feet bgs. <br /> May 6, 2008 —The SJCEHD issued a letter approving Apex's Sample Reduction Request Letter, <br /> dated January 23, 2008. The SJCEHD approved the following groundwater monitoring <br /> frequency: quarterly sampling of MW-3, MW-7, MW-8, MW-10, MW-11, VEW-2, and RW-2; <br /> semi-annual sampling of MW-4A and MW-12; and annual sampling of MW-2, MW-5, MW-6, <br /> MW-9, MW-13, MW-14, MW-16 and MW-17. <br /> August 18, 2008 —Apex installed monitoring well MW-15 to a total depth of 20 feet bgs. Apex <br /> submitted the results of the installation in a results report on December 8, 2008. <br /> April 30, 2009—Apex submitted a letter to the SJCEHD requesting that the analytical suite for <br /> r <br /> groundwater samples be reduced to include only total petroleum hydrocarbons as gasoline <br /> r <br /> r <br />