Laserfiche WebLink
Third Quarter 1997 Groundwater Monitoring Report <br /> Moore Petroleum,Inc.,54917"F"Street,Banta,CA <br /> September 17, 1997 <br /> Page 2 <br /> On May 5, 1995, a soil vapor extraction system consisting of an R.S.I. SAVE system was <br /> installed at the subject site. The vapor extraction system was installed per San Joaquin Valley <br /> Unified Air Pollution Control District (SJVUAPCD)Permit conditions. The vapor extraction <br /> system consists of an internal combustion engine with catalytic converters mounted on the <br /> exhaust. The system was set up such that soil vapors could be extracted from either vapor well <br /> VW-1 and/or monitoring well MW-l. The system was started on May 5, 1995, and has operated <br /> through October 4, 1995, at which time it was temporarily removed from site. On November 27, <br /> 1995, the system was returned to the subject site and restarted. <br /> An air sparge system was installed for use in conjunction with the vapor extraction system. The <br /> air sparge system consists of a one horse power electric motor which powers a 10-cubic feet per <br /> minute (CFM) oil-less compressor. The compressor injects air through an air sparge point located <br /> midway between VW-1 and MW-1 (Figure 2). The air sparge system was started on May 31, <br /> 1995 and operated intermittently through August 30, 1995, at which time its operation began to <br /> coincide with the operation of the R.S.1, system. <br /> On April 29, 1997, Apex received permission from the San Joaquin County Environmental Health <br /> Division (SJCEHD)to shut down the air sparge and vapor extraction system due to low influent <br /> sa.w, soil vapor concentrations to the vapor extraction system. As of April 29, 1997, the remediation <br /> system has extracted a total of 1,730 pounds of total petroleum hydrocarbons (TPH), as gasoline, <br /> and 19.9 pounds of benzene. <br /> GROUNDWATER MONJTORING <br /> Groundwater Levels <br /> On July 29, 1997, Apex personnel collected groundwater-level measurements from all six <br /> monitoring wells in accordance to the Apex Standard Operating Procedures (SOP) included as <br /> Appendix A. All groundwater elevations were measured to the nearest 0.01 foot, referenced to <br /> the surveyed top-of-casing elevations. Groundwater level measurements collected since January <br /> 1993 are summarized in Table 1, A potentiometric surface map of the shallow water-bearing <br /> zone on July 29, 1997, is shown on Figure 3. <br /> Groundwater Sampling and Analysis <br /> A letter dated April 29, 1997 from the SJCEHD, stated that they concurred with Apex's <br /> recommendations to reduce the sampling of the monitoring wells to annually, with the exception <br /> of wells MW-1 and MW-4, which will still be monitored on a quarterly basis. However, in a letter <br /> dated July 18, 1997 from the Central Valley Regional Water Control Board (RWQCB), included <br /> as Appendix C, the subject site has been required to analyze seven oxygenate compounds <br /> commonly used in California gasoline. As a result, on July 29, 1997 Apex personnel collected <br /> C:IKBPROJ--lTRA021ERA02.0041QMR 0897.WPD <br />