My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011825
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:15:23 PM
Creation date
12/6/2019 4:34:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011825
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Results Report and First Quarter 2001 Groundwater Monitoring Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> <�rJ Page 7 <br /> • VEW-2: TPHg, TPHd, and TPH motor oil were detected at 1,100 ug/L, 4,900 ug/L, <br /> and 1,200 ug/L, respectively. BTEX was above detection limits except toluene, which <br /> was non-detect. MTBE was the only oxygenate detected at 17 ug/L. <br /> • RW-2: TPHg and TPHd were detected at 3,600 ug/L and 1,300 ug/L, respectively. <br /> All of the BTEX compounds were above detection limits, with ethylbenzene at 410 <br /> ug/L and total xylenes at 270 ug/L. MTBE was the only oxygenate detected at 250 <br /> ug/L. <br /> The Rhodes domestic well sampled on January 8 and February 20, 2001 and was non-detect for j <br /> all analyzed constituents. 11 <br /> Apex is-currently in the process of performing a groundwater pump test on RW-2 scheduled for <br /> the last week in March 2001. Details are described in the Workplan mentioned in the Background 1 <br /> portion of this report. <br /> Apex recommends continuing quarterly groundwater monitoring to confirm laboratory data. The <br /> next monitoring event is scheduled for April 2001. I <br /> + REPORT DISTRIBUTION <br /> A co of this Report was submitted PY p d to. . <br /> Mr. Mark List <br /> Central Valley Regional Water Quality Control Board <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Mr. Jerry Moore i <br /> Moore Petroleum <br /> I <br /> 5491 F Street <br /> Banta, California <br /> i <br /> 1 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.