Laserfiche WebLink
Results Report and First <br /> p Quarter 2001 Groundwater Monitoring Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 8 <br /> REMARKS/SIGNATURES <br /> The information contained within this Report reflects our professional opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. This Report was prepared solely for the use of Moore Petroleum. Any <br /> reliance on this Report by parties other than Moore Petroleum will be at their own risk. <br /> The work described above was performed under the direct supervision of the professional <br /> geologist, registered with the State of California, whose signature appears below. i <br /> i <br /> We appreciate the opportunity to provide Moore Petroleum geologic, engineering and <br /> environmental consulting services, and trust this Workplan meets your needs. If you have any <br /> questions or comments, please call us at (916) 535-0200. - <br /> Sincerely, <br /> APEX ENVIROTECH, INC. J� <br /> I <br /> Michael S. Sgourakis <br /> Project Manager <br /> Pat Wright tRED-- <br /> ED SFO . <br /> Principal Geologist �wQQ►� VW. <br /> ['�,: <br /> CRG No. 529 <br /> -k No. 529 <br />