My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011828
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011828
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:16:33 PM
Creation date
12/6/2019 4:34:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011828
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Workplan for Interim Remediation&4`h Quarter 2000 Groundwater Monitoring Report <br /> k-6.01 Former Moore Petroleum Bulk Plant,549I F Street,Banta,California <br /> Page 3 of 9 <br /> PROPOSED REMEDIATION WELL INSTALLATIONS <br /> Apex proposes to drill four soil borings and convert three of the four borings into six inch <br /> diameter groundwater remediation wells RW-1, RW-2 and RW-3, (Figure 4). The fourth boring, <br /> (VEW-2) will be converted into a four inch diameter vapor extraction well. The three proposed. <br /> soil borings (RW-1, RW-2 and RW-3) will be drilled to an anticipated total depth of 30 feet <br /> below grade (bg) with the use of a hollow stem auger drill rig. The fourth boring (VEW-2) will <br /> be drilled to an anticipated total depth of 20 feet bg. <br /> Soil samples will be collected at five-foot intervals, obvious lithologic changes, or obvious <br /> hydrocarbon odors from each of the borings. All fieldwork will be conducted according to the <br /> Apex SOP included in Appendix B. <br /> MONITORING WELL CONVERSION <br /> .The one existing four inch diameter groundwater monitoring (MW-8)has a four inch conduit and <br /> daylights inside the vault box already. This four inch conduit runs from MW-8 to the back of the <br /> warehouse (Figure 4). This conduit was installed during the removal and excavation of the two <br /> former USTs located east of the office. Groundwater monitoring well MW-8 will also be <br /> referred as VEW-1. <br /> BORING AND WELL CONSTRUCTION REQUIREMENTS <br /> Prior to drilling, well permits will be obtained from the County and Underground Service Alert <br /> (USA) will be contacted for identification of buried utilities at or entering the project site from <br /> the public right-of-way. As.a further precaution against drilling into or through potential buried <br /> obstructions, the first five feet of each boring will be augured by hand. <br /> At a minimum, the wells will be constructed according to the standards found in the California <br /> Code of Regulations, Title 23, Section 2647 and 2648 and the California Department of Water <br /> Resources Bulletins 74-81 and 74-90. The four proposed wells will also be constructed <br /> according to the Apex SOP included in Appendix B and include 0.020-inch perforated casing. <br /> The filter pack will be placed from 2 feet above the screen interval to total depth. The bentonite <br /> seal will be placed from 2 to 4 feetabove the screen interval and a cement/bentonite slurry will <br /> be placed from near surface to 4 feet above the screen interval. The wells will be secured with a <br /> Q� Q locking, watertight cap. <br /> C � <br />
The URL can be used to link to this page
Your browser does not support the video tag.