Laserfiche WebLink
Workplan for Interim Remediation&4`h Quarter 2000 Groundwater Monitoring Report <br /> Former Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 8 of 9 <br /> REMARKS/SIGNATURES <br /> The information contained within this Workplan reflects our professional opinions and was <br /> developed in accordance with currently available information, and accepted hydrogeologic and <br /> engineering practices. This Workplan was prepared solely for the use of Moore Petroleum. Any <br /> reliance on this Workplan by parties other than Moore Petroleum will be at their own risk. <br /> The proposed work described above will be performed under the direct supervision of the <br /> professional geologist, registered with the State of California, whose signature appears below. <br /> We appreciate the opportunity to provide Moore Petroleum geologic, engineering and <br /> environmental consulting services, and trust this Workplan meets your needs. If you have any <br /> questions or comments,please call us at(916) 535-0200. <br /> Sincerely, <br /> APEX ENVIROTECH, INC. <br /> t . <br /> Tom E. Landwehr <br /> Project Manager <br /> Pat Wright G" <br /> g .tF,a �p <br /> Principal Geologist ��5�`yV RIG <br /> CRG No. 529 ffl� <br /> * No. 529 <br /> r <br /> CA <br /> L�F4 <br />