My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011850
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:19:12 PM
Creation date
12/6/2019 4:37:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011850
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i First Quarter 2002 Groundwater Monitoring Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 6 <br /> • VEW-2: TPHg increased significantly from 8,200 ug/L last quarter to 33,000 ug/L <br /> this quarter. All other constituents were within historical range. <br /> • RW-2: TPHg increased from 770 ug/L last quarter to 5,500 ug/L this quarter and all <br /> other constituents were within historical range. Toluene was detected this quarter at <br />! 22 ug/L. <br /> The Rhodes domestic well was sampled on January 31, 2002, February 11, 2002, and March 26, <br /> 2002 . Concentrations were non-detect for all analyzed constituents. <br /> Apex recommends continuing quarterly groundwater monitoring to confirm laboratory data and <br /> monthly groundwater sampling of the domestic well. The next monitoring event is scheduled for <br /> May 2002. <br /> Apex has received an Authority to Construct(A/C)permit from the SJVUAPCD for anew vapor <br /> extraction unit and treatment system. System installation and start up is pending delivery of the <br /> system. It is anticipated that the system will be installed and started in May 2002. <br /> i - <br /> i <br /> Z <br /> r <br /> r <br /> r <br /> { <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.