Laserfiche WebLink
Interim Remediation Plan and Second Quarter 2001 Groundwater Monitoring Report <br /> v Moore Petroleum Bulls Plant,5491 F Street,Banta,California <br /> Page 5 <br /> On March 27, 2001, a round of groundwater levels was collected manually from recovery well <br /> RW-2 and monitoring wells MW-3, MW-8, MW-9, and MW-12 before the test began. The <br /> transducers were turned on at 10:00 AM and the pumping test initiated at 10:15 PM. The <br /> pressure transducers recorded water levels at 5-minute intervals. Additional groundwater levels <br /> were collected manually from recovery well RW-2. The pump operated for 48-hours during the <br /> test. The pressure transducers continued to collect data for approximately 90-minutes after the <br /> pump was turned off. <br /> All manual groundwater elevations were measured to the nearest 0.01 foot, referenced to the <br /> surveyed top-of-casing elevations, and performed according to the Apex Standard Operating <br /> Procedures (SOP) included as Appendix B. Groundwater level measurements collected <br /> manually from recovery well RW-2 during the pumping test are summarized in Table 1. Manual �� <br /> groundwater elevations collected from the monitoring well containing the pressure transducers <br /> were calibrated into the pressure transducer data to reflect actual groundwater elevations. <br /> Groundwater elevation data from the data loggers are presented in graphical and tabular format in <br /> Appendix C. A complete round(with the exception of well MW-6) of groundwater levels was <br /> also collected on March 29, 2001 at 9:00 AM to determine the hydrologic control imposed by <br /> dewatering the former tank basin area during the pumping test (Table 2). <br /> Groundwater Sampling and Analysis <br /> Apex personnel collected groundwater samples from recovery well RW-2 at 1:15 PM on March <br /> 27, 2001 and at 10:00 AM on March 29, 2001 at the conclusion of the test. The samples were <br /> submitted, under chain-of-custody, to CLS Labs of Rancho Cordova, California, a state-certified <br /> analytical laboratory. All samples were collected according to the Apex SOP. Analytical results <br /> are for TPHg, and as diesel (THPd); benzene,toluene, ethylbenzene, and total xylenes (BTEX) <br /> by EPA Method 8020; and di-isopropyl ether(DIPE), ethyl tertiary butyl ether(ETBE), methyl- <br /> tert-butyl ether(MTBE), tertiary amyl methyl ether(TAME), and tertiary butyl alcohol (TBA), <br /> collectively the `five oxygenates' by EPA Method 8260 are summarized in Table 3. The <br /> laboratory analytical reports and chain-of-custody forms are included as Appendix D. All <br /> detected constituents have been converted into pounds removed based on the analytical results <br /> and the volume of groundwater removed during the pumping test. The total pounds of gasoline <br /> constituents removed during the pumping test are summarized in Table 4. <br /> Pumping Test Results <br /> Figure 3 is a groundwater contour map of the shallow water-bearing zone on April 5, 2001 under <br /> static conditions. Based on the Figure 3 potentiometric surface map, groundwater beneath the <br /> site flows in a northeasterly direction at an approximate hydraulic gradient of 0.0075 ft/ft under <br /> natural conditions. Figure 4 illustrates the potentiometric surface under pumping conditions <br /> collected during the final minutes of the 48-hour pumping test. As shown on Figure 4, <br /> Naw, groundwater flow near well MW-12 was not influenced during the pumping test. <br />