My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011857
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011857
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:29:30 PM
Creation date
12/6/2019 4:40:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011857
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUARTERLY GROUND WATER MONITORING REPORT <br /> 5491 F Street,Barna.California <br /> r <br /> 6 <br /> Work completed through August 1988 by ETS, included: <br /> o Drilling of one soil boring which was completed as groundwater monitoring <br /> well MW-1; <br /> o Collection of soil samples during drilling and ground water samples after <br /> well development; <br /> o Submittal of soil and groundwater samples for analytical testing; and <br /> o Preparation of an Environmental Preliminary Site Assessment report. <br /> Work completed through May 1989 by Delta included: <br /> o Drilling of two soil borings which were completed as groundwater <br /> monitoring wells MW-2 and MW-3; <br /> o Collection of soil samples during drilling and ground water samples after <br /> 1 well development; <br /> (� o Submittal of soil and groundwater samples for analytical testing; <br /> o Measurement and calculation of groundwater flow direction and hydraulic <br /> gradient; and <br /> o Preparation of a Preliminary Hydrogeologic Assessment Report. <br /> Work completed through August 1990 by NGA included: <br /> o Drilling of three soil borings which were completed as groundwater <br /> monitoring wells MW-4 through MW-6; <br /> o Collection of soil samples during drilling and ground water samples after <br /> well development; <br /> o Submittal of soil and groundwater samples for analytical testing; <br /> o Measurement and calculation of groundwater flow direction and hydraulic <br /> gradient; and <br /> o Preparation and submittal of a Problem Assessment Report utilizing the <br /> l analytical results of the groundwater sampling event of 6 July 1990. <br /> 4✓ <br /> 90-O99A.RFT 2- "" <br />
The URL can be used to link to this page
Your browser does not support the video tag.