Laserfiche WebLink
i <br /> f <br /> Third Quarter 2002 Groundwater Monitoring Report } <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 5 t <br /> The SVE system was installed at the site and started on June 17, 2002. A permit compliance <br /> source test was conducted on July 2, 2002. Source test results and system operating data are <br /> contained in the Source Test Results Report, dated August 3, 2002. <br /> I <br /> A complete presentation of system operating data and evaluation of system performance will be <br /> presented separately, following the end of the third quarter 2002. <br /> r ADDITIONAL ACTIVITES PERFORMED AT SITE <br /> i <br /> None <br /> ATTACHMENTS: ; <br /> Figure 1: Site Vicinity Map <br /> Figure 2: Site Plan Map } <br /> Figure 3: Groundwater Contour Map: July 22, 2002 <br /> Figure 4: TPHg Isoconcentration Map: July 22, 2002 <br /> Figure 5: TPHd lsoconcentration Map: July 22, 2002 <br /> Figure G: TPHmotor oil Isoconcentration Map: July 22, 2002 <br /> Figure 7: Benzene Isoconcentration Map: July 22, 2002 r <br /> Figure 8: MTBE Isoconcentration Map: July.22, 2002 <br /> Table 1: Groundwater Level Data <br /> Table 2: Groundwater Analytical Results <br /> Table 3: Historical Groundwater Level Data <br /> Table 4: Historical Groundwater Analytical Results <br /> li <br /> Appendix A: Apex Standard Operating Procedures <br /> Appendix B: Field Data Sheets <br /> Appendix C : Laboratory analytical Reports and Chain-of-Custody Forms <br /> i <br /> M <br /> I <br />