My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011867
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011867
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:35:17 PM
Creation date
12/6/2019 4:49:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011867
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> Fourth Quarter 2004 Remediation Status Report <br /> Moore Petroleum Sulk Plant,5491 F Street,Banta,California <br /> Page 3 <br /> September 26, 2003 - Apex submitted a workplan that recommended in-situ chemical oxidation <br /> by ozone sparging to remove the total petroleum hydrocarbons as diesel (TPHd)1 motor oil (mo) <br /> TPHmo mass from the soil and groundwater. fit <br /> November 10, 2003 - An addendum to the workplan was requested in a letter by the SJCEHD to <br /> increase the scope of work to further delineate the.hydrocarbon plume by installing additional <br /> monitoring wells. Technical data on the ozone system and the spacing of the sparge points was <br /> also requested. On January 14, 2004, Apex submitted a report titled,Addendum to Workplan for <br /> Ozone Sparging, addressing the November,10, 2003 SJCEHD letter. <br /> May 12, 2004 - The SJCEHD responded to the aforementioned Addendum to Workplan for <br /> Ozone Sparging, by approving the proposed ozone sparge wells and requesting application for <br /> drilling permits. <br /> The SJCEHD directed that an addendum be made by June 1, 2004, to the Workplan for a Limited <br /> Subsurface Site Investigation, dated Jan 14, 2004, in order to define the vertical extent of I <br /> contamination. <br /> September of 2004-Apex installed and tested an SVE system with activated carbon adsorption <br /> as the control device. In addition, Apex installed an ozone generator system for eventual ozone A <br /> sparging. Drilling permits to install the sparging diffusers and an encroachment permit for <br /> drilling and trenching in the public right of way were obtained in November of 2004. <br /> December 6-8,'2'004—Apex supervised the drilling of nine ozone sparge wells (OS-2 through <br /> OS-10). Ozone wells were advanced to a depth of 25 feet below ground surface. Further <br /> information can be found in the forthcoming well installation results report. <br /> GENERAL SITE INFORMATION <br /> Site name: Moore Petroleum <br /> I <br /> Site address: 5491 F Street, Banta, California <br /> Current property owner: Van De Pol Enterprises, Inc. <br /> Current site use: Petroleum Bulk Plant <br /> Current phase of project: Groundwater monitoring, active soil vapor remediation <br /> Number of wells: 9 monitoring wells; 3 monitoring/vapor extraction wells; 2 <br /> vapor extraction wells; 1 recovery well; and 1 air sparge <br /> well; 1 domestic well <br /> I <br /> fi <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.