My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011878
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011878
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:55:37 PM
Creation date
12/6/2019 4:52:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011878
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Third Quarter 2005 Groundwater Monitoring and Remediation Status Report <br /> Moore Petroleum Bulk Plant,5491 F Street,Banta,California <br /> Page 2 <br /> May 5, 1995 - A soil vapor extraction (SVE) system consisting of an R.S.I. SAVETM system was <br /> installed at the subject site. The vapor extraction system was installed per San Joaquin Valley <br /> Unified Air Pollution Control District permit conditions. The SVE system consisted of an <br /> internal combustion engine with catalytic converters mounted on the exhaust. The system was <br /> configured to allow soil vapors to be extracted from either vapor well VEW-1 and/or monitoring <br /> well MW-1. The system was started on May 5, 1995, and operated through October 4, 1995, at <br /> which time it was temporarily removed from the site. On November 27, 1995, the system was <br /> returned to the subject site and restarted. <br /> May 31, 1995 - An air sparge system was installed and started, this was used in conjunction with <br /> the SVE system. The air sparge system operated intermittently through August 30, 1995, at <br /> which time its operation began to coincide with the operation of the R.S.I. system. The air sparge <br /> system consisted of a one horsepower electric motor which powers a 10-cubic feet per minute <br /> oil-less compressor. The compressor injected air through an air sparge point located midway <br /> between VEW-1 and MW-1. <br /> April 29, 1997 - Apex received permission from the San Joaquin County Environmental Health <br /> Division (SJCEHD) to shut down the air sparge and vapor extraction system due to low influent <br /> soil vapor concentrations. As of April 29, 1997, the remediation system had extracted a total of <br /> 1,730 pounds of total petroleum hydrocarbons, as gasoline (TPHg), and 199 pounds of benzene. <br /> k...- September 10, 1997 -Apex submitted the report, titled Over Excavation & Groundwater <br /> Removal Workplan, proposing over excavation, de-watering and sampling of the bulk loading <br /> rack and tank basins during the removal of nine underground storage tanks (UST). <br /> August 17, 1998 and September 8, 1998 - Apex supervised the removal of two 350 gallon USTs, <br /> T-8 and T-9 (kerosene and cleaning solvent, respectively), fn addition, seven 10,000-gallon <br /> USTs were removed on September 8, 1998. Following the removal of T-9, soil was over <br /> excavated and an exploratory trench was dug. Apex collected two soil samples and one <br /> groundwater sample from the over-excavation and exploratory trench. One soil sample was <br /> collected from beneath T-8. After the removal of the seven 10,000-gallon USTs, Apex collected <br /> four soil samples and one groundwater sample from the tank pit. Apex then collected six soil <br /> samples and two water samples from beneath the tank basin. Nine soil samples from the area <br /> beneath the former bulk loading rack were submitted for analysis. The results of all soil and <br /> water sampling were documented in the report, titled Tank Closure Results and <br /> Recommendations Report, dated December 23, 1998. <br /> April 8 - 9, 1999 -Apex personnel supervised the advancement of eight soil borings at the <br /> subject property. The results of all soil and water sampling were documented in the report, titled <br /> Results Report for Subsurface Investigation and Second Quarter 1999 Groundwater Monitoring, <br /> dated June 1, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.