My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011880
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
F
>
5491
>
3500 - Local Oversight Program
>
PR0545028
>
ARCHIVED REPORTS_XR0011880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 5:57:38 PM
Creation date
12/6/2019 4:52:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011880
RECORD_ID
PR0545028
PE
3528
FACILITY_ID
FA0003919
FACILITY_NAME
VAN DE POL ENTERPRISES
STREET_NUMBER
5491
STREET_NAME
F
STREET_TYPE
ST
City
BANTA
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
5491 F ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,� ,. <br /> i <br /> t <br /> Second Quarter 2005 Groundwater Monitoring and Remediation Status Report <br /> Moore Petroleum Balk Plant,5491 F Street,Banta,California <br /> Page 6 <br /> REMEDIATION SYSTEM SUMMARY <br /> Soil Vapor Extraction System <br /> System description: <br /> j <br /> Petroleum vapors are extracted from the subsurface through three monitoring/vapor wells (VEW- <br /> 3/1\4W-8, MW-1, and VEW-4/MW-7) and two vapor extraction wells (VEW-1 and VEW-2). The <br /> wells are manifolded together with PVC piping in the remediation compound before connecting <br /> to the extraction system. The vapor extraction system is a 5-horsepower regenerative blower <br /> manufactured by Rotron-Ameteko Model number EN6F72L. Activated carbon adsorption abates <br /> the volatile organic compounds extracted by the SVE system. The system is operating under the <br /> authority of the SJVAPCD, Authority to Construct#N 560-8-2. <br /> System startup date: June 17, 2002 <br /> Current system mode: Carbon abatement (September 29, 2004) <br /> Active extraction wells: VEW-2, VEW-3, VEW-4 <br /> Inactive extraction wells/reason: MW-1, VEW-1 system optimization, zero concentrations <br /> Status of system operation during reporting period/ reasons for downtime: <br /> The SVE system operated continuously during this reporting period, with the exception of the <br /> June 23, 2005, site visit in which the high temperature sensor for the SVE system shut the system <br /> down..The SVE system restarted normally and field data was recorded. According to hour meter <br /> i <br /> readings recorded in the field the SVE system operated for a total of 100 days between March 2, <br /> 2005 and June 9, 2005. <br /> Vapor Analysis Performed: <br /> I <br /> Analysis Abbreviation Designation LISEPA Method No. <br /> 1 <br /> Total Petroleum Hydrocarbons TPH Gas-Range <br /> as Gasoline g Hydrocarbons <br /> I Benzene Aromatic <br /> Toluene BTEX Volatile 82608 <br /> Eth !benzene Organics i <br /> i <br /> Xylenes (Total) <br /> Methyl Tertiary Butyl Ether MTBE Fuel <br /> Oxygenate � <br /> All effluent samples collected during this reporting period were reported as containing no <br /> concentrations above laboratory detection limits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.