My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FARMINGTON
>
3132
>
3500 - Local Oversight Program
>
PR0545036
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:11:25 PM
Creation date
12/9/2019 2:40:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545036
PE
3528
FACILITY_ID
FA0004837
FACILITY_NAME
B & B EQUIPMENT CO
STREET_NUMBER
3132
STREET_NAME
FARMINGTON
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306002
CURRENT_STATUS
02
SITE_LOCATION
3132 FARMINGTON RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
__, �...... a... .. .rwaa LJV1V <br /> %nor, KLEINFELDkR <br /> U-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the pVC <br /> casings arc usually surveyed and tied into permanent markers, if readily available. Survey <br /> accuracy is Q-1 foot for the"x"and"y,coordinates and.01 foot for the "z" coordinate_ The depth <br /> to static groundwater is measured from a set location at the top of the PVC casing (usuany the <br /> north rim)_ The doth of water is then subtracted from the elevation of the top of the well casing <br /> to provide a groundwater elevation for each monitoring well location. <br /> BA GROUNDWAIER MONITORING <br /> B4.1 Water Level Measurements <br /> Vater level measurements are niade in the wells pxior to purging and sampling the wells. <br /> Measurement protocol is as follows. <br /> 1. TExe water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse,prior to use in each well, <br /> 2. Fater level measurements are made using a conductivity-based water-level mem. <br /> Depth-to-water is generally measured from a surveyed mark on the nm&rim of the PVC <br /> well casing. <br /> The water level measurements are oanved vd to elevations using the surveyod casing elevations. <br /> 11-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling protocol <br /> for each well is as follows: <br /> I- Down-well equipment (pumps, bailers, etc.) is decontaminated by stemn cleaning, or by <br /> scrubbing in a trisodiun'-phosphate or non-phosphate detergent wash followed by a <br /> distilled water rinse,prior to use in each well. Bailer cord is replaced prior to use'i„each <br /> well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level meter- <br /> 3. Tbe volume of water in gallons standing in the well is calculated by subtracting the depth <br /> to groundwater measurement f m the depth of the well and multiplying by the <br /> appropriate conversion factor(0.16 for 2 nch wells,and 0.65 for 4-inch wells). <br /> 4. Three to five well vohlmes of water are purged from each well using a submersible pump, <br /> bladder pump,or Teflon bailer. <br /> 20-YP]5681201IP131/2011C235 Page P,6 <br /> copyrigbt 2001,KWnfelda,Inc. May t4,2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.