My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FEATHER RIVER
>
0
>
2900 - Site Mitigation Program
>
PR0515051
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:22:57 PM
Creation date
12/9/2019 2:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0515051
PE
2950
FACILITY_ID
FA0012034
FACILITY_NAME
HOME DEPOT (PROPOSED STORE #725)
STREET_NUMBER
0
STREET_NAME
FEATHER RIVER
STREET_TYPE
DR
City
STOCKTON
Zip
95219
CURRENT_STATUS
01
SITE_LOCATION
FEATHER RIVER DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFE LD ER <br /> B-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is washed <br /> in a trisodium phosphate or non-phosphate detergent solution and rinsed in distilled water or <br /> steam cleaned prior to use in the next monitoring well. <br /> B-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the PVC <br /> casings are usually surveyed and tied into permanent markers, if readily available. Survey <br /> accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the "z" coordinate. The <br /> depth to static groundwater is measured from a set location at the top of the PVC casing (usually <br /> the north rim). The depth of water is then subtracted from the elevation of the top of the well <br /> casing to provide a groundwater elevation for each monitoring well location. <br /> B-4 GROUNDWATER MONITORING <br /> B-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measurements, the monitoring wells would be opened and <br /> allowed to equilibrate for a period of approximately '/2 hour. <br /> 2. The water level probe is decontaminated in a trisodium phosphate or non-phosphate <br /> detergent wash, followed by a distilled water rinse, prior to use in each well. <br /> 3. Water level measurements are made using a conductivity-based water-level meter. <br /> Depth-to-water is generally measured from a surveyed mark on the north rim of the PVC <br /> well casing. <br /> The water level measurements are converted to elevations using the surveyed casing elevations. <br /> 20-YP9-022/2019P 156 Page B-6 <br /> Copyright 1999 Kleint'elder, Inc. May 18, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.