My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIELD
>
1856
>
2900 - Site Mitigation Program
>
PR0523459
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:18:25 AM
Creation date
12/10/2019 8:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523459
PE
2959
FACILITY_ID
FA0015853
FACILITY_NAME
TYCO ELECTRONICS (FORMER)
STREET_NUMBER
1856
STREET_NAME
FIELD
STREET_TYPE
AVE
City
STOCKTON
Zip
952032037
APN
13339003
CURRENT_STATUS
01
SITE_LOCATION
1856 FIELD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . Brief Description and history of the Site: (Include previous <br /> and current uses of site, a Lrief description of the cleanup <br /> action and concentrations of significant hazardous substances <br /> left on site) <br /> The parcel's building was completed in 1982 by <br /> Blatt Development Corporation. LIKA Corporation leased the <br /> site the same Year for use in multilayerina of circuit boards. <br /> Caustic soda, hydrochloric acid, and rinsewaters were the primary <br /> wastestream components Excavation of 448 Yd3 of contaminated oil <br /> was completed as a RA measure. Ground waters of high pH and copper <br /> content were recovered by drainage. <br /> 4. Tyne of Site: (Check appropriate response.) <br /> Included in Bond Expenditure Plan? <br /> Yes X No <br /> RCRA-Permitted Facility Bond - funded <br /> RCRA Facility Closure RP - funded _ <br /> *NPL <br /> Federal Facility <br /> Other (i.e. , walk-in) : Explain Briefly: <br /> 5. size of Site: (Based on Expenditure Plan definition of size.) <br /> Small X Medium Large Extra Large <br /> G. Dates of Remedial Action,• <br /> a. Initiated: 9 April 1987 b. Completed: 22 ffAy1987 <br /> *Per SARA, any NPL site that is not permanently cleaned must be <br /> scheduled for a follow-up visit after 5 years to verify that cleanup <br /> measures are still satisfactory. <br /> -2- September 1987 <br /> ZIDA00d 80IODMHO 01 'V 'd 'a 1V0 [ KOMI MH AM:Lo U_K_�0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.