Laserfiche WebLink
3 . Brief Description and history of the Site: (Include previous <br /> and current uses of site, a Lrief description of the cleanup <br /> action and concentrations of significant hazardous substances <br /> left on site) <br /> The parcel's building was completed in 1982 by <br /> Blatt Development Corporation. LIKA Corporation leased the <br /> site the same Year for use in multilayerina of circuit boards. <br /> Caustic soda, hydrochloric acid, and rinsewaters were the primary <br /> wastestream components Excavation of 448 Yd3 of contaminated oil <br /> was completed as a RA measure. Ground waters of high pH and copper <br /> content were recovered by drainage. <br /> 4. Tyne of Site: (Check appropriate response.) <br /> Included in Bond Expenditure Plan? <br /> Yes X No <br /> RCRA-Permitted Facility Bond - funded <br /> RCRA Facility Closure RP - funded _ <br /> *NPL <br /> Federal Facility <br /> Other (i.e. , walk-in) : Explain Briefly: <br /> 5. size of Site: (Based on Expenditure Plan definition of size.) <br /> Small X Medium Large Extra Large <br /> G. Dates of Remedial Action,• <br /> a. Initiated: 9 April 1987 b. Completed: 22 ffAy1987 <br /> *Per SARA, any NPL site that is not permanently cleaned must be <br /> scheduled for a follow-up visit after 5 years to verify that cleanup <br /> measures are still satisfactory. <br /> -2- September 1987 <br /> ZIDA00d 80IODMHO 01 'V 'd 'a 1V0 [ KOMI MH AM:Lo U_K_�0 <br />