Laserfiche WebLink
7 . ResO0nse ACt gM_Taken_ pn Site: (Check appropriate action) <br /> Initial Removal or Remedial Action (site inspection/ <br /> sampling) <br /> X Final Remedial Action <br /> RCRA enforcement/closure action <br /> No action, further investigation verified that no cleanup <br /> action at site was needed. <br /> A. Type of Remedial Action (e.g. , Excavation and redisposal on- <br /> site treatment) : Excavation and redisoosal at the Casmalia <br /> Class I Landfill San Luis Obispo Ccunty <br /> B. Estimated quantity of waste associated with the site (i.e. , <br /> tons/gallons/cubic yards) which was: <br /> 1. _ treated Amount: <br /> 2. untreated (capped sites) Amount: <br /> 3 . X removed Amount 448 <br /> 8. Cleanup Levels/Standards <br /> A. What were the cleanup standards established by DHS pursuant <br /> to the final Remedial Action Plan (RAP) or workplan (if <br /> cleanup occurred as the result of a Removal Action (RA) or <br /> Interim Remedial Measures (IRM) prior to development of a <br /> RAP)? <br /> Cooper at 35 ma/ka and lead at 10 mo/ka <br /> B. were the specified cleanup standards met? Yes X No <br /> C. If "no„, why not?: <br /> 9. pHs Involvement in the Remedial Action <br /> A. Did the Department order the Remedial Action: <br /> Yeses__. No Date of order: 11-23=17_ <br /> S. Did the Department review and approve (check appropriate <br /> action and indicate date of review/approval if done) : <br /> Review & - 7-86 <br /> Approve Sampling Analysis Procedures Date: <br /> Review & 5-27-86 <br /> Approve Health & Safety Protections Date: <br /> Review Removal/Disposal Procedures Date: 1-28-07 <br /> Review Removal Action Plan Date:_2-18; 2-20; 4-24 ; & <br /> B-19, 1987 <br /> -3- September 1987 <br /> MADH 8EIDY976O G 01 'V 'd l IV] I KIM NOH KVDU:LO £6-K-H <br />