Laserfiche WebLink
1 <br /> 2 removal and remedial activities for Respondents, and post <br /> 3 remedial sampling and monitoring procedures for air, soil , <br /> 4 surface water and groundwater. <br /> 5 <br /> 6 a. Upon Department approval of the RA Workplan and <br /> 7 schedule Respondents shall implement the final RAP as <br /> 8 approved in accordance with the approved RA Workplan <br /> 9 and schedule. <br /> 10 b. Respondents shall be responsible for operation and <br /> 11 maintenance requirements in accordance with the final <br /> 12 RAP and RA Workplan. <br /> 13 C. During the implementation of the final RAP and RA <br /> 14 Workplan the Department may specify such additions, <br /> 15 modifications and revisions to the RA Workplan as it <br /> 16 deems appropriate to implement the RAP. <br /> 17 d. Any remedial technology employed in implementation of <br /> 18 the final RAP shall be left in -place and operated by <br /> 19 Respondents until the Department determines and states <br /> 20 in writing that Respondents may discontinue or modify <br /> 21 some or all of such remedial technology because <br /> 22 Respondents have met the criteria specified in the <br /> 23 final RAP for discontinuance of such technology or <br /> 24 because such modifications would better achieve the <br /> 25 goals of the final RAP. <br /> 26 5. 3 COST RECOVERY <br /> 27 5. 3 . 1 Respondents shall be liable for all direct costs, <br /> COURT PAPER <br /> STATE OF CALIFORNIA _ <br /> STO. 113 (REV. R 721 -� <br /> 85 MM <br />