My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIELD
>
1856
>
2900 - Site Mitigation Program
>
PR0523459
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 9:18:25 AM
Creation date
12/10/2019 8:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523459
PE
2959
FACILITY_ID
FA0015853
FACILITY_NAME
TYCO ELECTRONICS (FORMER)
STREET_NUMBER
1856
STREET_NAME
FIELD
STREET_TYPE
AVE
City
STOCKTON
Zip
952032037
APN
13339003
CURRENT_STATUS
01
SITE_LOCATION
1856 FIELD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 approved Workplan schedule. The Community Relations Plan should <br /> 3 be based on EPA's "Community Relations in Superfund - A <br /> 4 Handbook" (March, 1986) . <br /> 5 5. 2 REMEDIAL ACTION PLAN <br /> 6 5. 2 . 1 Draft Remedial Action Plan <br /> 7 By 20 December 1987 Respondents shall prepare and submit to the <br /> 8 Department for review and approval a draft Remedial Action Plan <br /> 9 (RAP) . Addendums to the dRAP shall be included. The RAP shall <br /> 10 set forth in detail appropriate steps to remedy air, soil, <br /> 11 surface water and groundwater contamination at the Site and <br /> 12 adjacent areas. The RAP shall be prepared in accordance with <br /> 13 the standards and requirements set forth in California Health <br /> 14 and Safety Code Section 25356. 1. In addition the RAP shall <br /> 15 contain a master schedule for implementation of all removal and <br /> 16 remedial actions not already taken. <br /> 17 5. 2 . 2 Implementation of Final Remedial Action Plan <br /> 18 Within fifteen (15) calendar days after Department approval of <br /> 19 the final RAP in accordance with Health and Safety Code Section <br /> 20 25356. 1, Respondents shall submit to the Department a detailed <br /> 21 Remedial Action (RA) Workplan containing technical and <br /> 22 operational plans and engineering designs for implementation of <br /> 23 the approved remedial or removal action alternative, and a <br /> 24 schedule for implementating each activity. The Workplan shall <br /> 25 also describe the nature and design of the construction or <br /> 26 equipment to be employed, a Site specific Hazardous Waste <br /> 27 Transportation Plan (if necessary) , the identity of any <br /> contractors, transporters and other persons conducting the <br /> COURT PAPER <br /> ✓1TAT[OF GLIIORNIA -8- <br /> STD. 113 IREV. B 731 <br /> 85 31]58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.