Laserfiche WebLink
0963c"-6 <br /> schedule, (2) a discussion of the potential chemical and physical <br /> hazards associated with the work to be performed, (3) hazard <br /> identification, (4) purpose and limitations of personal protective <br /> equipment, (5) decontamination and emergency response procedures, and <br /> (6) proper on-site conduct. <br /> Personnel, who have not been fit tested to respirators assigned to <br /> them, must be fit tested in accordance with procedures described in "A <br /> Guide to Industrial Respiration Protection" (Pritchard, J_A. 1976, <br /> NIOSH) . <br /> 7.0 CONTAMINATION MONITORING <br /> No contamination monitoring is necessary. Site Safety Officer will kv'�yi <br /> k sY <br /> determine if respirators are required during cement coring <br /> 8.0 DECONTAMINATION <br /> All personnel leaving the site must remove all protective equipment <br /> and wash their hands and faces before leaving the site, before eating <br /> or drinking, and before entering any vehicle (truck, auto) or building. <br /> Contaminated disposable protective equipment (coveralls, gloves, <br /> booties, and respirator cartridges) must be placed either in plastic <br /> bags or drums, which shall be disposed of in— a manner to <br /> Lika Com cials. � 5 �-j u!N �� <br /> 9.0 COMMUA'ICATIONS <br /> Field investigators should be within visual distance with at least one <br /> other field member at all times. <br />