Laserfiche WebLink
Lika Corp. -2- <br /> filter pack material designed for the aquifer to be screened <br /> will indicate the slot size to use on the screen. If a <br /> bentonite seal is placed below the water table, 1/4-inch <br /> pellets should be used. If the bentonite seal is placed <br /> above the water table, 8-20 mesh granules should be used. <br /> The bentonite seal should be wetted with potable water (1 <br /> gallon of water for every two pounds of bentonite) . At <br /> least 1/2 hour should be allowed for hydration of the <br /> bentonite prior to placing the cement grout. <br /> 0 Well development should be done using a vented surge block <br /> or bailer. Any fluid extracted from the wells must be <br /> stored in containers and tested. If the water is <br /> contaminated, it must be treated as hazardous waste. This <br /> fluid must not be discharged onto the ground or into the <br /> sewer, as proposed in the plan unless it is deemed <br /> nonhazardous by laboratory analysis. <br /> 0 If ground water contamination is detected in Phase I <br /> monitoring, the installation of deeper level <br /> piezometers/monitoring wells will be required. <br /> Piezometers/monitoring wells will need to be 4" in diameter <br /> and have screen lengths of less than 10 feet; these wells <br /> will be installed in approximately the same deposits which, <br /> in the Stockton area, should be at nearly the same depth. <br /> Construction details of these wells will need to have DHS <br /> approval prior to their installation. <br /> 0 A more complete schedule is required. Dates for drilling <br /> boreholes and installing monitoring wells for Phase I and <br /> Phase II should be added to the plan. <br /> o Item 4 Hazard Assessment in the Site Safety Plan refers to <br /> removal of plating tanks and spilled materials. Lika must <br /> document the removal and disposal of these items and furnish <br /> this information to this office. <br /> o The reference to the Corps of Engineers in Section 6. 1, <br /> Medical Monitoring appears to be a mistake. <br /> 0 The names of the project safety officer and site safety <br /> officer should be added to the Site Safety Plan. <br /> MR:baw <br />