Laserfiche WebLink
WHF Environmental Consultants, Inc. <br /> Health & Safety Plan for Deboer Family Trust <br /> Page: 3 <br /> 2.0 Safety Implementation <br /> �- The provisions of the WHF Environmental Consultants, Inc. Health and Safety Plan are <br /> mandatory for all personnel associated with the site project and operations. <br /> r• A complete background review and site visitation will be conducted in order to determine <br /> whether specific amendments are to be made to the Health and Safety Plan based on specific <br /> characteristics which may exist on the job site. Any suspected hazards associated with the on- <br /> site operation which exposure to, via inhalation or skin absorption, to such as suspected <br /> carcinogens or human sterilants, will be documented and specific guidance will be developed <br /> and added to this Health and Safety Plan as Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> investigations. The project site layout has built-in safety features. The site is divided into <br /> }} three zones. The following list defines the required personnel protective equipment. <br /> t� <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use <br /> the following protective equipment and measures as warrant by the Project Manager:- <br /> • Coveralls as an undergarment <br /> • Saranex outer garment <br /> • Sample gloves (inner) <br /> • PVC, Nitrile or Neoprene outer gloves <br /> • Hard hat <br /> • Steel toe boots <br /> • Robars or Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic <br /> vapor, acid gas, pesticide, radionuclide, high efficiency filter). Note that <br /> cartridges should be changed daily. <br /> • All joints to be taped <br /> • Self-contained air will be utilized if project dictates <br /> r <br /> More stringent protective equipment requirements will be implemented if necessary. <br /> This determination will be made by the project supervisor after review of the materials <br /> to be handled, the ambient monitoring data, consultation with on-site technical <br /> personnel, the Safety Officer, and the proper management personnel. Upgrades in PPE, <br /> if necessary, will be implemented. <br /> a� <br />