Del Monte AS/GAC Cost Est <br /> Dei Monte Plant 33 <br /> Air Stripper and Of€gas Control (GAC) <br /> SF031604.DA <br /> _ QTY Unit $/unit COST COMMENT <br /> SITEWORK <br /> Site Preparation 1 LS 5,000 51000 Allowance <br /> EQUIPMENT ^ <br /> Flow EQ Tank 1 LS $6,000 $6,000 3,000 gal tank <br /> Influent Pumps 4 each $1,500 $t-,000 <br /> Air Stripping system 2 each $15,000 $30,600 <br /> Acid Addition System i LS $4,000 $4,000 <br /> Caustic Add. System 1 LS $4,000 $4,000 <br /> Blowers 2 each $2,000 $4,000 <br /> Effluent Pumps 2 each $1,500 $3,000 <br /> Duct Heater 1 each $1,500 $1,500 _r <br /> VP Carbon unit 2 each $7,500 $15,000 1 standby unit <br /> ' iSuv�Ctr0191t® - <br /> u Subtotal 78,500 <br /> Unquantified Items (596 of subtotal) 3,925 <br /> Freight Allowance (10% of subtotal) 7,850 <br /> Installation Allowance (15$ of subtotal) 11,775 i <br /> Subtotal a 102,050 I <br /> MECHANICAL ( 15% of Equipment Total p 15,308 <br /> ELECTRICAL & I&C ; 15% of Equipment Total } 15,308 <br /> CONSTRUCTION COST SUBTOTAL 132,665 <br /> Contingency i 25% of CCS ) 33,166 <br /> I iJ <br /> TOTAL CONSTRUCTION COST 165,831 <br /> } Mob,Demob,Bonding, & Insurance ( 8% of TCC ) 13,266 <br /> w- Permitting & Legal ( St of TCC ) 8,292 <br /> Services During Construction ( 5% of TCC } 8,292 <br /> E Start-Up Costs ( 5t of TCC ) 8,292 <br /> TOTAL IMPLEMENTATION COST 203,973 <br /> Engineering Design Costs ( 121k of TIC ) 24,47, <br /> TOTAL CAPITAL COST 22$,000 <br /> R <br /> 5 <br /> Pagel <br /> ,.. <br />