Laserfiche WebLink
r <br /> Del Monte ASIGAC Cost Est <br /> Annual O&M Costs <br /> O'TY Unit $/unit Total Cost <br /> Labor 832 hr 25.00 $20,800 2 day/wk <br /> Maintenance 5* Const Cost $8.292 <br /> Power <br /> Stripper Pumps 7,423 Kw-hr 0.1 $742 <br /> Chemical Casts <br /> Hydrochloric Acid i LS 250 $250 . Estimate <br /> Caustic 1 LS 750 $750 Estimate <br /> =M� Carbon Replace/gegen 12,000 lbs 2.4 $28,800 Based on Average Conc <br /> O&M Subtotal- $59,634 ^' <br /> Contingency (10% of subtotal) $5,963 <br /> ! O&M Total- $66,000 <br /> F <br /> i { <br /> 3 <br /> i <br /> i <br /> x <br /> 1 <br /> a i <br /> 4 - 'E <br /> Page 1 <br />