Laserfiche WebLink
C j <br /> Dal Moate UN Par Cost Est Y <br /> Annual O&M Costs <br /> QTY unit $/unit Total Cort <br /> Labor 547.5 hr 25.00 $13,688 0.5 hr/shift <br /> Maintenance 5% Const Cost+other $9,612 <br /> 9 Taj+. <br /> Powe- <br /> Pimps 4,949 Kw-hr 0.1 $495 <br /> UV Lamps 262,800 Kw-hr 0.1 $26,280 30K4P Reactor <br /> Chemical Costs <br /> Peroxiw'e 1 LS 4000 $4,000 Estimate <br /> - - ow�>mwa9aowaw "�41 <br /> O&M subtotal- $54,074 ti'tc <br /> Contingency (10% of subtotal) $5,407 }� � <br /> 06M Totah $59,000 [ rW <br /> f <br /> Tf <br /> 4 <br /> a <br /> r <br /> s5k� <br /> x. <br /> 9,1 <br /> z,ePagel <br /> i, <br /> r i <br /> i <br />