My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012693
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0012693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 2:43:32 PM
Creation date
12/10/2019 10:35:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012693
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br /> Del Monte UN Per Cost East <br /> Del Monte Plant 33 <br /> UV/Peroxide System <br /> SF031604.DA <br /> rtQTY Unit $/unit COST rOgr <br /> SITEiQORK - <br /> c Site Preparation 1 LS <br /> 5,000 <br /> 5,000 A?lovance <br /> j E12UIPWNT <br /> Flow EQ Tank 1 LS $6,000 <br /> Influent Pumps 2 each $6+000 3,OO�J gal tank <br /> �. $1,500 $3,000 <br /> R i W/PerOX System 1 each $70,004 $70,000. <br /> i� Peroxide Add System 1 LS $4,000 <br /> $4,000 <br /> Effluent Pumps 2 each $1,500 $3,000 _ <br /> s % Subtotal 91,006 <br /> k <br /> Unquantified Items (5% of subtotal) 9,550 <br /> FreightAllowance (101 of suCtotal) 9,100 <br /> c Installation Allowance 115% of subtotal) 33,651s <br /> i <br /> Subtotal m 118,300 <br /> A <br /> MECHANICAL ! 15 of Equipment Total ) 17,745 <br /> ELECTRICAL & I&C { 15.% of Equipment Total ) 17,745 <br /> CONSTRUCTION COST SUBTOTAL 153,790 <br /> Contingency { -2.5$ of CCS ) 38,448 <br /> TOTAL CONSTRUCTION COST Aa 192,238 <br /> r,1 <br /> Mob,Demob,Bonding, &Insurance ( 8; of TCC ) 15,379 <br /> i Permitting & Legal ( 5% of TCC ) ' <br /> 9,612 <br /> Services During Construction ( 5% of. TCC ) 9,612 . y <br /> Start-Up Costs ( 5% of TCC ) 9,612 <br /> -gorsssar:- ff <br /> TOTAL IMPLEMENTATION COST 236,453 f _ <br /> Engineering Design Casts ( 12% of TIC ) 28,374 <br /> - --------- <br /> '+ TOTAL CAPITAL COST - 265,000 <br /> k o <br /> y <br /> Pagel <br />
The URL can be used to link to this page
Your browser does not support the video tag.