+ Ream the hole with 10-inch diameter bit to a depth of 2 feet below the top of the confining layer. <br /> • Install an 8 3/-inch diameter steel conductor casing within the boring and grout up to surface with <br /> cement-bentonite grout containing approximately 2 percent non-beneficiated bentonite.Grout mixture <br /> will not exceed 7-1/2 gallons of water for each 94-pound bag of cement. The grout will be pumped <br /> through a tremie pipe from the bottom of the borehole to the surface. The grout will be allowed to set <br /> for 24 hours before continuing well installation. <br /> • All water will be removed from the conductor casing and checked for leakage prior to continuing <br /> drilling. <br /> • Drill through bottom of conductor casing with 6-inch diameter bit using mud-rotary. <br /> • Soil samples for lithologic description shall be taken continuously from the bottom of the conductor <br /> casing using a 94 mm core system until the next water-bearing zone is encountered and defined. <br /> • Install a 2-inch diameter Schedule 40 PVC casing and 10 feet of 0.020-inch slot well screen following <br /> the methods described above. <br /> 3.2.2 Extraction Well Installation <br /> One extraction well will be installed to a depth of approximately 120 ft bgs at the location shown in Figure <br /> 2. The exact depth of the screen interval will be determined in the field.Installation procedures are as <br /> discussed in Section 3.2.1,with the following exceptions outlined below. <br /> • Drill a 6-inch diameter pilot boring to approximately 120 feet bgs using mud-rotary drilling methods. <br /> • Soil samples for lithologic description shall be taken continuously from 50 feet to approximately 120 <br /> feet bgs using a 94 mm core system.Additionally,up to two soil samples will be collected at depths to <br /> be determined in the field.The samples will be labeled,placed in ziplock bags,and placed in an ice- <br /> filled cooler. Soil samples will be analyzed for TPH-gas,benzene,toluene,ethylbenzene,xylenes <br /> (BTEX),CAM 17 metals,bulk density,specific gravity,total organic carbon (TOC),and oxygenates, <br /> including 1,2-Dichloroethane(1,2-DCA), 1,2-Dibromoethane(EDB),and tert Butanol(TBA),by EPA <br /> Method 8260, in a state-certified laboratory. <br /> • Ream hole with 10-inch diameter bit. <br /> 0 The extraction well will have a sediment trap with 2 feet of blank stainless steel casing,approximately <br /> ! 20 feet of stainless steel flush threaded 0.040 slot screen,and 6-inch OD Schedule 80 PVC casing to the <br /> ground surface.#8/16 Monterey sand shall be used as the filter pack. The well shall be completed <br /> with well monument with a minimum diameter of 36 inches. The exact screen interval will be <br /> determined in the field. <br /> Potential groundwater and soil sample analyses associated with the CPT Investigation and well <br /> installation are summarized in Table 1. Table 2 summarizes the required sample containers,preservations, <br /> and holding times. <br /> 3.2.3 Aquifer Testing <br /> ? An aquifer pumping test will be performed on the newly installed extraction well to assess the hydraulic <br /> properties and maximum pumping rate of the impacted zone. <br /> CATEMP\WaRKPuw_DCA 1.Doc 7 <br />