My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 7:50:50 PM
Creation date
12/10/2019 11:35:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011015
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> • ETBE by EPA Method 8260B [non-detect < 0.50 pg/1]; and <br /> TAME by EPA Method 8260B [non-detect < 0.50 pg/1]. <br /> A summary of analytica[ data is presented in Table 3. <br /> 5.3 SOIL GAS MONITORING RESULTS <br /> The air samples were collected and analyzed for the performance evaluation of the <br /> catalytic oxidizer. The results showed inlet concentrations of TPH-g and benzene with <br /> concentrations of 360 ppmv and 0.091 ppmv, respectively. The results of the outlet <br /> sampling showed TPH-g and benzene at concentrations of 2.1 ppmv and non-detect, <br /> respectively. The destruction efficiency of the catalytic oxidizer was calculated at 99%. <br /> The volume of TPH-g and benzene removed this quarter reflects a decrease versus <br /> past results. The total estimated pounds of TPH-g removed during Kleinfelder's <br /> operation of the system are approximately 25,854 pounds (per date of the sampling). <br /> Photoionization detector (PID) readings were recorded from VE-1, VE-2, VE-3, VE-4, <br /> VE-5, and the mainline before and after the dilution valve on July 22, August 26, and <br /> September 29, 2005. The PID readings ranged in concentrations from 126 ppmv to 359 <br /> ppmv in the VE samples, and 181 ppmv to 344 ppmv in the mainline samples. <br /> 5.4 DWR WELL DRILLER LOGS REVIEWED RESULTS <br /> Kleinfelder conducted a water well survey within a 2,000-foot radius of the site to <br /> ascertain whether any new wells have been installed and are pumping. DWR Well <br /> Drillers Logs were reviewed and showed no new water wells or multiple pumping wells <br /> within the 2,000-foot radius of the site. The seasonal fluctuations of groundwater <br /> elevations may be linked to naturally occurring rainfall/recharge, and/or groundwater <br /> extraction practices near the site. In areas of such flat gradients, slight changes in <br /> groundwater elevations can affect the groundwater flow directions. The groundwater <br /> elevations at the sight typically range between much less than a foot. <br /> 12280.MON/ST05R1424/cD:ly Page 11 of 14 <br /> 02005, Kleinfelder, Inc. November 15,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.