Laserfiche WebLink
r . . <br /> Attachment A <br /> Equipment Checklist <br /> monitoring well construction details(geologic log,screened interval,well depth, <br /> borehole diameter,etc.). <br /> water level indicator <br /> submersible positive displacement pump and controller or bladder pump(e.g. <br /> Grundfos Redi-Flo,QED Well Wizard,etc.) <br /> PTFE lined polyethylene tubing in sufficient quantity to use new tubing for each <br /> well <br /> Throttling valves and 3-way flow-tee sampling valve(See Figure 1) <br /> field meters for pH,Eh,dissolved oxygen,temperature,electrical conductance <br /> calibrated bucket or beaker <br /> flow cell with ports for each of the field meter probes(optional) <br /> field note book and/or well purging log forms <br /> sample containers,preservatives,ice and cooler(s) <br /> decontamination supplies <br /> personal protective equipment <br /> SFO10030987.DOC T}-6 <br />