Laserfiche WebLink
TC Asweiges Inc. <br /> Qtr AsommmAQUality CWM Plan <br /> Revised March 1998 <br /> sewer. Drummed waw will be labeled with the source of the water to help aIStiT appropriate disposal <br /> based on contamination levels. <br /> 1,0 SOY SAWLING PROTOC,OL <br /> 11.1. Sampk Cola During Drilling Activities <br /> A lxopood w be ubn tted to the Iced r pbbxy ritY PrOP f <br /> Vocations. Thin vast locatiiat and'number ofborings at eadz site will be d+simninad iia t1'te field <br /> by the Prnject Geolcigistf ineer. <br /> Prior to wing at the Wimple site, the drill tWougm will be steam cleaned and ail.sample <br /> e quipin att will.be cleaned. Cly will be conducted on-site ion all satTipling equipment <br /> between each sample interval. <br /> Soil:sw*m will be obtained wing a Calif is modified spbt4poon sampler contriiinglm <br /> 6-inch long, 2-inch diameter brass tubes. The sampler will be driivw. 18-homes algid dt the <br /> hollow stem auger by a 140-pound hammer with a 30-inch drop in accordance with American <br /> Society fitlesting.and Materials(ASM Methods D 1586-84 for split barrel sampling of ma <br /> eud D 1587-83 fx r thin-walled tube sampling of sails. The blows required to drive the sampler <br /> e 44.6&. . jakova1 will be.re wr+ded on thie boring log: The saimpler will be rweved f om the <br /> odd to reveal the brass tubes. The bottom tube will be sealed with aluminum <br /> fi or teflon tape and plastic end caps,taped and labeled with the following information: <br /> date and time <br /> project ID <br /> sampieID <br /> :1( name of sampler <br /> type ofanaiysis to be performed <br /> w:uaa>iatis )QAQC4sDoc <br /> 10 <br />