My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
1116
>
3500 - Local Oversight Program
>
PR0545046
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 6:31:00 PM
Creation date
12/10/2019 3:52:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545046
PE
3528
FACILITY_ID
FA0003700
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #3
STREET_NUMBER
1116
Direction
E
STREET_NAME
FIRST
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16903006
CURRENT_STATUS
02
SITE_LOCATION
1116 E FIRST ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Aasocistea Inc. <br /> Quality AmwawdQuaiity Control Plan <br /> Revised Arm 1948 <br /> Ibis sample will be immediately placed into a cooler containing dry ice or froze clw'nical ice. <br /> A"higli--low" temperatm recording thartnon ter will accompany sample shonents to etrme <br /> proper tenverature,;maentenance. The samples willbe delivered to a state=dd laboratory <br /> folk under d4��protocol within 48 hours of sampling,whenever possible. <br /> Soil in the uppermost brass tube vill be desccnibed according tt ASTM standard practice for <br /> description and identification of soils (ASTM D-2488-84).. Stratigraphic, genetic and other <br /> datalinterpretations will.also be recorded. Soil properties may also be determined from the <br /> meddle brass Uft and from the sampler shoe. Alterrlrativ*the second sante tube miry be <br /> used with the uppermost tube for preparation of duplicates. These field observations will.be <br /> opted ona,log prepared for each boring/well.. <br /> During sampliM latex gloves wit be worn to prevent ` with.Odw samples. <br /> The disposable gloves wfl a discarded alter collecting samples from each 18-inch sample <br /> SON samples will be collected at 5-fM uttcxvals,at significant changes in MWOV:Ow bkrvals <br /> .of obvious contamination in order to develop a complete profle of'svilvantamiination. <br /> ILL Sample Collection During Tank Removal <br /> Soil samples wig be collected as soon as possible after removal oftlte tank. Where feasible;all <br /> preparations tions for soil sampling will be made prior to tank removal. Soil sanipla collet ied fivin <br /> a backhoe bucked or directly f= the excavation ;floor will be collectedin a t&wWW <br /> stainless steel or brass cyfinder.at leatIrinches long by 14A in diameter. Fw m 3 to 24- <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.