My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003213
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2470
>
2600 - Land Use Program
>
SA-91-31
>
SU0003213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 6:00:28 PM
Creation date
12/10/2019 4:15:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003213
PE
2633
FACILITY_NAME
SA-91-31
STREET_NUMBER
2470
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
2470 WATERLOO RD
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CONDITIONS OF APPROVAL <br /> JUNE M. FERRONI <br /> SA-91-31 <br /> Unless otherwise specified, all Condition of Approval must be <br /> fulfilled prior to the establishment of the use and the issuance of <br /> any building permits. <br /> This approval will expire 18 months from the date of approval <br /> unless (1) all Conditions of Approval have been complied with, (2) <br /> all necessary building permits have been secured and remain in <br /> force, and (3) all necessary permits from other agencies have been <br /> secured and remain in force. <br /> 1. DEPARTMENT OF PUBLIC WORKS <br /> ORDINANCE REQUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements cannot be modified. <br /> a. An Improvement Plan, showing drainage, driveway access <br /> details, on-site parking, existing and proposed utility <br /> services, and grading, shall be submitted to the Department of <br /> Public Works for approval. <br /> b. Dedication to result in a 55-foot wide right-of-way from the <br /> centerline of Waterloo Road to the Property line shall be <br /> required across the frontage of APN 141-282-25. <br /> C. A six and one half foot (6. 51 ) wide concrete sidewalk shall be <br /> constructed in conformance with San Joaquin County Standards <br /> along the frontage of Waterloo Road. The construction of the <br /> frontage improvements (sidewalk) will be deferred upon <br /> execution by the owner of a Deferred Frontage and Roadway <br /> Improvement Agreement or a Secured Deferred Frontage and <br /> Roadway Improvement Agreement with a deposit equivalent to <br /> their estimated construction costs prior to issuance of a <br /> Building Permit/Improvement Plan. (A $250. 00 fee currently is <br /> required for processing per Planning Title Section 9-10502 in <br /> addition to a copy of the Grant Deed and an estimate for the <br /> required frontage improvements. The estimate shall be <br /> prepared by a Registered Civil Engineer with a typical section <br /> drawing on a form to be supplied by the Department of Public <br /> Works and submitted to the Department of Public Works for <br /> approval. As an option the Department of Public Works will <br /> prepare the drawing and estimate for an additional fee of <br /> $100. 00) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.