My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
1303
>
2900 - Site Mitigation Program
>
PR0531103
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 8:57:25 AM
Creation date
12/11/2019 8:33:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0531103
PE
2950
FACILITY_ID
FA0020032
FACILITY_NAME
C A MATT FORMER TEXACO
STREET_NUMBER
1303
STREET_NAME
FIRST
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22709001
CURRENT_STATUS
01
SITE_LOCATION
1303 FIRST ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McHenry Avenue Road Widening Project <br /> and vehicle access to land uses adjacent to the roadway and improve drainage conditions along <br /> McHenry Avenue. This project will not involve changes (widening)to City roadway facilities <br /> or service capabilities that would induce unplanned growth or remove an existing obstacle to growth. <br /> Property Acquisition and Tree Removal <br /> As part of the proposed project, it will likely be necessary to remove several structures and two <br /> olive trees located along the east side of McHenry Avenue between First Street and Catherine Way. <br /> Each of the properties that would be affected by the project and the types of structures that would be <br /> affected are identified below in Table 1. The proposed project would also remove two olive trees <br /> from the area in front of the residence at 2700 McHenry Avenue(APN 247-150-02).The trees and <br /> buildings that would be removed as part of the project are also identified by Map ID numbers <br /> on Figures 1 through 3. <br /> TABLE 1 <br /> PROPERTY ACQUISITION <br /> Figure Map <br /> # ID APN/Address Land Use Property to be Acquired <br /> 1 1 227-090-0111303 First Country Cutts Barber Shop— Complete Acquisition— <br /> Street Commercial Building to be removed. <br /> 1 2 227-090-0111303 First Aquatic Discount Scuba—Commercial Complete Acquisition— <br /> Street Building to be removed. <br /> 1 3 227-090-01/1303 First Accessory Building/Restroom Complete Acquisition— <br /> Street Building to be removed. <br /> 1 4 227-090-01/1303 First Accessory Building/Caretaker's Complete Acquisition— <br /> Street Residence Building to be removed. <br /> 1 5 227-090-02/1750 Single Family Residence and ancillary Complete Acquisition— <br /> McHenry Avenue structures Buildings to be removed. <br /> 1 6 227-090-03/1740 Single Family Residence Complete Acquisition— <br /> McHenry Avenue Building to be removed. <br /> 3 7&8 247-150-0212700 Single Family Residence Partial Acquisition—tree <br /> McHenry Avenue removal at front of property. <br /> The City will follow local and state requirements (California Relocation Assistance Law, <br /> Government Code Sections 7260-7277)regarding relocation assistance and payments of benefits <br /> to affected property and business owners. As part of its compliance with state law,the City will <br /> prepare an appraisal report that will govern the acquisition payments to affected property and business <br /> owners and will work individually with these property and business owners to address specific <br /> property acquisition issues. <br /> For any trees that would be removed that are in the City of Escalon's Street Tree Plan,the City will <br /> obtain the necessary approvals prior to removal in accordance with City of Escalon Ordinance 147. <br /> Construction Approach and Phasing <br /> The construction period would last approximately 3 to 4 months for all phases of construction, <br /> including startup and finishing activities. Actual road construction activities would likely occur <br /> over a 6 to 8 week period. Phases are anticipated to include: <br /> McHenry Avenue Road Wcaning Project 2 ESA/208588 <br /> Initial Study May 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.