Laserfiche WebLink
Initial Study <br /> • Demolition and Grading <br /> • Pavement and Improvement Installation <br /> • Slurry and Seal <br /> • Restriping <br /> Construction equipment and vehicles to be used at the project site include 3 to 4 backhoes and a <br /> blade scraper to perform demolition and grading activities. Several water trucks will be used for <br /> dust control,and 3 to 4 heavy trucks will be used to haul away construction debris. <br /> Construction Schedule <br /> The earliest estimated beginning date of construction for the proposed project is April 2010. <br /> As previously described, the duration of construction for these improvements is estimated to <br /> be 3 to 4 months,depending on weather conditions. The hours of construction activity are <br /> expected to be limited to weekdays from 7 a.m. to 5 p.m. <br /> Equipment Storage,Vehicle Storage,and Staging Areas <br /> The location of areas to be used for equipment storage, vehicle storage, and staging areas will <br /> be determined by the City and the construction contractor. The northeast portion of the project <br /> site near the intersection of First Street and McHenry Avenue includes potential areas available <br /> for the temporary storage of construction equipment and materials(see Figure 1). <br /> Drainages <br /> Construction-related activities associated with the proposed project would not cross or affect <br /> any major drainages near the project site. Additionally,the City will ensure that the construction <br /> contractor implements a variety of standard best management practices to minimize erosion- <br /> related impacts during project construction. <br /> Traffic Management <br /> The proposed project can be constructed while maintaining the existing traffic movements along <br /> McHenry Avenue. However, it is anticipated that minor unavoidable traffic delays may occur <br /> during the construction period. The City will ensure that the construction contractor implements <br /> a standard traffic management plan to minimize traffic disruption and ensure adequate access <br /> is maintained to surrounding residential areas and businesses near the project site. <br /> 9. Surrounding Land Uses and Setting. <br /> The proposed project is located along McHenry Avenue in the City of Escalon,California.The project <br /> site is located adjacent to low-density residential neighborhoods,a shopping center,car dealerships, <br /> several vacant lots,and a hardware store.An orchard, industrial land uses,and the Union Pacific <br /> Railroad are located to the west of McHenry Avenue across the street from the project site. <br /> 10. Other public agencies whose approval is required. <br /> The proposed project would disturb an area over one acre. Therefore, an NPDES Permit from the <br /> Regional Water Quality Control Board and preparation of a Storm Water Pollution Prevention <br /> Plan (SWPPP)will be required. <br /> McHenry Avenue Road Wdening Project 3 ESA 1208588 <br /> Initial Study May 2009 <br />