My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
5023
>
2900 - Site Mitigation Program
>
PR0505777
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 9:18:20 AM
Creation date
12/11/2019 8:44:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0505777
PE
2950
FACILITY_ID
FA0006180
FACILITY_NAME
RAMACHER MANUFACTURING CO
STREET_NUMBER
5023
STREET_NAME
FLOOD
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
10517032
CURRENT_STATUS
02
SITE_LOCATION
5023 FLOOD RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> f � <br /> C 2.0 EXCAVATIONAND STOCKPILING <br /> The four areas containing TPH concentrations greater than the SJC action level of 100 <br /> mg/kg included the perimeter ditch behind the wash area (Area 1 ), underneath the <br /> machine room waste bins (Area 4), outside the west doors of the repair shop (Area <br /> 8), and the west side of the equipment storage area (Area 2). Areas 3, 5, 6, and 7 <br /> had significant surface staining, but had concentrations of TPH lower than the SJC <br /> action level. These areas are shown in Figure 2. <br /> Approximate dimensions of each excavation were estimated prior to the start of field <br /> work, using analytical results from the Phase II investigation. The dimensions of the <br /> actual excavation were measured in the field by the field geologist. The final <br /> measured dimensions are shown on Figure 2. <br /> IC <br /> The soils were removed from the excavations with a backhoe. Excavation continued <br /> Cuntil all visibly stained soil was removed. The soils removed from each excavation <br /> iwere stockpiled on and covered with plastic sheeting (Figure 2). The stockpile of soils <br /> from all areas except Area 1 contained approximately 31 cubic yards of soil. <br /> t� The soil removed from the ditch behind the wash area (Area 1 ) was placed on and <br /> covered with plastic sheeting in a separate stockpile. The results from the Phase II <br /> Site Assessment indicated that this area contained elevated levels of lead and <br /> cadmium, which could require that the excavated material be disposed of at a licensed <br /> CClass I landfill. The ditch stockpile contained approximately 40 cubic yards of soil. <br /> C2. 1 Storm Drain <br /> During excavation of the of the ditch behind the wash area, the end of a drain pipe <br /> Cfrom the on-site storm water collection system was uncovered. This 1 2-inch diameter <br /> steel pipe was connected to a 8-inch steel pipe running down the middle of the ditch. <br /> CCIMAIN\FMC\5042\FMCRM.DOC 2_1 <br /> 99IHYORO-SERRCHAI G A Tetra Tech Company <br /> I - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.