My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009468
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
ARCHIVED REPORTS_XR0009468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:52:19 AM
Creation date
12/11/2019 10:28:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009468
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFSNA Industries Inc- AMA <br /> !_FQuality Assurance/Quality Control Plan Q r <br /> Revised November 199'_ <br /> To reduce the potential for cross contamination between wells, the monitorings will take place <br /> in order from the least to most contaminated if known. Wells containing o tanning free product will be <br /> �f_ monitored last. Between each well monitoring the equipment will be decontaminated. <br /> F <br /> Water level data collected from the wells will be used to develop a groundwater contour map <br /> for the project site. Groundwater flow will be estimated to bendicular to <br /> penile egvipoteatial <br /> lines drawn on the map. <br /> m' 10.0 WELL DEVELOPMENT PROTOCOL <br /> Groundwater monitoring wells will be surged and developed prior to setting the surface seal. <br /> "1 Approximately 10 times the volume of water in the casing will be withdrawn if possible. Casing <br /> I i <br /> volumes will be calculated in the following manner: <br /> SSyy VOLUME OF SCHEDULE 40 PVC PIPE <br /> VolI <br /> Diameter (inches) I.D. (inches) <br /> Gal/)in2 2.067 0.4 4.026 o. <br /> VOLUME OF OPEN BOREHOLE AND ANNULAR SPACE BETWEEN CASING=AND.H.00E <br /> Hole Volumellinear Feet of Hole Nominal Volume/Linear FeetC f = >{ <br /> Diameter Casing Annular Spacer <br /> Diameter <br /> (inches) =: <br /> Gallons Cubic Feet (inches) Gallons Cubic:Feet- <br /> 7.25 2.14 0.29 2 1.91 0.26 <br /> 8.25 2.78 0.37 2 2.55 0.34'- <br /> 10.25 <br /> .34 - <br /> 10.25 4.29 0.57 2 4.06 0.54 <br /> 10.25 4.29 0.57 4 3.46 0.46 <br /> 12.25 6.13 0.82 4 1 5.30 0.71 <br /> r Annular volumea will be rnultiplied by 30% to account for porosity of filter pack. <br /> =� QAQcloss.ML <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.