My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009468
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
ARCHIVED REPORTS_XR0009468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:52:19 AM
Creation date
12/11/2019 10:28:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009468
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. r,. RESNA Industries Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> If the aquifer is slow to recharge, development will continue until recharge is too slow to <br /> practically continue. The volume of water produced versus time will be recorded. <br /> All withdrawn groundwater will be stored on-site in 55-gallon waste drums unless permission <br /> '= is ranted b theappropriate re ulato a enc to discharge the water to the ground surface or <br /> F>_ g Yregulatory agency g <br /> sanitary sewer. Drummed water will be labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> { 11.0 SOIL SAMPLING PROTOCOL <br /> 11.1 Sample Collection During Drilling Activities <br /> # A proposal will be submitted to the lead regulatory authority with proposed <br /> boring/sampling locations. The exact location and number of borings at each site will be determined in the field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers will be steam cleaned and all <br /> sample equipment will be cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> _i <br /> Soil samples will be obtained using a California modified split-spoon sampler containing <br /> g <br /> three 6-inch long, 2-inch diameter brass tubes. The sampler will be driven 18-inches <br /> ahead of the hollow stem auger b 140-pound ham <br /> g y a po mer with a 30-lnch drop :n <br /> .accordance with American Society for Testing and Materials (ASTM) Methods D 1586- <br /> 84 for split barrel sampling of soil and D 1587-83 for thin-walled tube sampling of soils. <br /> The blows required to drive the sampler each 6-inch interval will be recorded on the <br /> boring log. The sampler will be removed from the boring and opened to reveal the brass <br /> ` ' QAQCZM.FNL <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.