My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010437
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
ARCHIVED REPORTS_XR0010437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 10:09:43 AM
Creation date
12/12/2019 9:41:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010437
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> CRYSTAL CREAM & BUTTER COMPANY <br /> . WKA No 1628 07 <br /> June 5, 1996 <br /> Page 8 <br /> Health and Safety Plan <br /> All field procedures and activities will be conducted in accordance with a site-specific health and <br /> safety plan The health and safety plan will be developed in accordance with applicable <br /> requirements of the Califonna Environmental Protection Agency and the federal and state <br /> Occupational Safety and Health Administration <br /> All work will be completed under the supervision of an experienced California Registered <br /> Geologist, in accordance with current professional practice in this area and State and County <br /> guidelines <br /> TIME LINE <br /> • Drilling and well Installation activities will begin approximately two weeks from the time SJCEHD <br /> approves this workplan Subsequently, the air sparging/vapor extraction pilot test will begin <br /> within one to two weeks Our report of findings will be completed within four weeks from the <br /> time the field work is completed <br /> Please call us if you have any questions regarding our proposed scope of work <br /> Wallace ■ Kuhl & Associates, Inc <br /> 2'- <br /> Matthew A Taylor Kurt Balasek <br /> Senior Staff Engineer Senior Hydrogeologist <br /> MAT KMB sdm <br /> "goll628-01 wp <br /> WALLACE•KUHL <br /> Recycled papaw Er ASSOCIATES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.