Laserfiche WebLink
0 0 <br /> CRYSTAL CREAM & BUTTER COMPANY <br /> . WKA No 1628 07 <br /> June 5, 1996 <br /> Page 8 <br /> Health and Safety Plan <br /> All field procedures and activities will be conducted in accordance with a site-specific health and <br /> safety plan The health and safety plan will be developed in accordance with applicable <br /> requirements of the Califonna Environmental Protection Agency and the federal and state <br /> Occupational Safety and Health Administration <br /> All work will be completed under the supervision of an experienced California Registered <br /> Geologist, in accordance with current professional practice in this area and State and County <br /> guidelines <br /> TIME LINE <br /> • Drilling and well Installation activities will begin approximately two weeks from the time SJCEHD <br /> approves this workplan Subsequently, the air sparging/vapor extraction pilot test will begin <br /> within one to two weeks Our report of findings will be completed within four weeks from the <br /> time the field work is completed <br /> Please call us if you have any questions regarding our proposed scope of work <br /> Wallace ■ Kuhl & Associates, Inc <br /> 2'- <br /> Matthew A Taylor Kurt Balasek <br /> Senior Staff Engineer Senior Hydrogeologist <br /> MAT KMB sdm <br /> "goll628-01 wp <br /> WALLACE•KUHL <br /> Recycled papaw Er ASSOCIATES INC <br />