Laserfiche WebLink
Monitoring System Certificat. -Page 2 of 3 <br /> Site Address: 6131 Pacific Ave.@ Porter <br /> Date or Testing/Servicing: 1017/04 <br /> D. Results of Testing/Servicing <br /> Software Version Installed. 119.02 <br /> Complete the following checklist: <br /> 0 Yes 0 "o* Is the audible alarm operationai? <br /> 8 es p o Is e vis a.arm operation . <br /> 8 es 0 o Were all sensors visua .............insp91 ecte , tuncuo y teste , an co trine operational. <br /> es D a* eae sensors Inst at owest point of secondary containment an position so at o er equipment wi <br /> not interfere with their proper operation? <br /> es D o arms are re ay to a remote motutormg station, Is communications equipment(e.g. Ino em f <br /> 0 N/A operational? <br /> i! es ❑ o* or pressurized piping systems, oes the the automatic �( <br /> 0 N/A monitoringy s tit own i e piping Recon ary containment <br /> system detects a leak,fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> Positive shut-down?(Check all that appy) M Sump/Trench Sensors; 0 Disperser Containment Sensors. 1 <br /> Did you confine positive shut-down due to leaks and sensor failure/disconnection? M Ycs 0 No <br /> � es 0 0' ort systems at utilize a momtonng system as c primary t-0-41,11 warning device i.e. no <br /> it N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank f <br /> * fill point(s)and operating properly? If so, at what percent of tank capacity does the alarn trigger? 0 <br /> es pg o as any monitoring equipment replace yes, identify specLr sensors,probes,or other equipment replace <br /> and list the manufacturer name and model ter all replacement parts in Section E, below, <br /> i p •es pg o as iqui foundinside any secondarycontainment systems esigne as <br /> 0 Product; 0 Water. If yes,describe causes in Section E,below. YY systems. t nec a : at app y) <br /> es ! 0 o* as monitoring system set-up review to ensure proper settings (Atta�set-up re,00ru, if app icaole.jes 0 o s morutonng equipment operation per man acture s spec icatio <br /> *In Section E below, describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />