Laserfiche WebLink
Monitoring System Certifiestt,_ -Page 3 of 3 <br /> Site Address: 6131 Pacific Ave. @ Porter Date of Testing/Servicing: 10/7104 <br /> r... F. In-Tank Gauging 1 SIR Equipment: � <br /> Q9 heck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Lo Yes 1 ❑ NoHas alt input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> p Yes ❑ No• Were all tank gauging probes visually inspected for damage and residEbuild <br /> ❑Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑Yes Q No* Was accuracy of system water level readings tested? <br /> I� ❑Yes ❑ No' Were all probes reinsFalled properly? <br /> ❑Yes ❑ No Were a!I ;terns on the equipment manufacturer's maintenance checklis <br /> *in Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): p Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> a Yes ❑ No" I Forequipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑N/A (Check all Mat applyj Simulated leak reate: el 3 g.p.h. (1.); p 0.1 g.p.h. (2.); p 0.2 g.p.h. (2.). <br /> j' Notes: 1. Required for equipment start-up certificationaU annual certification. <br /> 2. finless mandated by local agency,certification regt:ired only for electronic LLD start-up. <br /> ' Yes 1-0 No Were all LLD's on operational and accurate within regulatory requirements? <br /> Yes Q No* Was the testing apparatus properly calibrated? <br /> �r Yes Q No* For mechanical.LLD's, does the LLD restrict product flow if it detects a leak? <br /> 19 N/A <br /> a Yes Q No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> C3 N/A <br /> 9§Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> J1 Yes a No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 1 <br /> (3 N/A malfunctions or fails a test? <br /> II Qq Yes [2 N/A q No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ;A Yes Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />