My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2002 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 3:26:44 PM
Creation date
12/16/2019 1:48:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2010
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
473
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certifiestt,_ -Page 3 of 3 <br /> Site Address: 6131 Pacific Ave. @ Porter Date of Testing/Servicing: 10/7104 <br /> r... F. In-Tank Gauging 1 SIR Equipment: � <br /> Q9 heck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Lo Yes 1 ❑ NoHas alt input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> p Yes ❑ No• Were all tank gauging probes visually inspected for damage and residEbuild <br /> ❑Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑Yes Q No* Was accuracy of system water level readings tested? <br /> I� ❑Yes ❑ No' Were all probes reinsFalled properly? <br /> ❑Yes ❑ No Were a!I ;terns on the equipment manufacturer's maintenance checklis <br /> *in Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): p Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> a Yes ❑ No" I Forequipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑N/A (Check all Mat applyj Simulated leak reate: el 3 g.p.h. (1.); p 0.1 g.p.h. (2.); p 0.2 g.p.h. (2.). <br /> j' Notes: 1. Required for equipment start-up certificationaU annual certification. <br /> 2. finless mandated by local agency,certification regt:ired only for electronic LLD start-up. <br /> ' Yes 1-0 No Were all LLD's on operational and accurate within regulatory requirements? <br /> Yes Q No* Was the testing apparatus properly calibrated? <br /> �r Yes Q No* For mechanical.LLD's, does the LLD restrict product flow if it detects a leak? <br /> 19 N/A <br /> a Yes Q No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> C3 N/A <br /> 9§Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑N/A or disconnected? <br /> J1 Yes a No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> 1 <br /> (3 N/A malfunctions or fails a test? <br /> II Qq Yes [2 N/A q No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ;A Yes Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.