Laserfiche WebLink
DCM C'ONS':CRI:`(" I.0N & Sll RVx-'ES, INC. <br /> HAZARD EVALUATION AND CONTROLS <br /> For each task to be performed on-site list any associated hazards and potential hazards. <br /> For each task hazard or potential hazard,provide the control method and/or the level of protection that shall be <br /> used to control that hazard. <br /> TASK DESCRIPTION OF HAZARD CONTROL METHOD <br /> Excavate to top of UST Equipment operation,open trench, Level D,Barriracades,caution <br /> gasoline tape,no smoking <br /> Install equipment Equipment operation, open Level D,barricades, caution tape,no <br /> excavation,vehicle traffic smoking <br /> Concrete Slab Equipment operation,vehicle traffic Level D,barricades,caution <br /> tape,traffic control <br /> SITE CONDITIONS AND LEVELS OF PROTECTION <br /> Specific Condition Contaminants PPE Level Level of Protection or <br /> Action <br /> Demo concrete Concrete dust D Normal <br /> Excavation Gasoline D Normal-LEL/02 Levels <br /> EVR Installation Gasoline D Normal—No Smoking <br /> Concrete Replacement Cement, lime D Normal—Traffic Control <br /> Note: Monitoring Comments(e.g. Breathing Zone). Obtain pertinent Training Certificates and MSDS. Noise <br /> levels above 85 dba will require hearing protection. Historical data indicates heavy equipment operations exceed <br /> 90dba;therefore hearing protection will be required during use of Heavy Equipment. ['29 CFR 1910.95.7] <br /> Pllvsical Hazard Control: X Excavation X Equipment X Noise Exposure <br /> Chemical Hazard Control: X Level D PPE <br /> Personnel Protective X Hard hats X Steel toed boots X Hearing/Eye protection as <br /> Equipment: needed <br />