Laserfiche WebLink
DCM CONSTRUCTION & SERVICES, INC. <br /> HAZARD EVALUATION AND CONTROLS (continued) <br /> Site Control Methods and Procedures: <br /> Monitoring Equipment: PID --10.6 ev Lamp FID X LEL/02 meter H-,S <br /> Instrument Daily Date: Documented: Log book and/or field <br /> Calibrated: forms <br /> Instrument Date: Documented: <br /> Calibrated: <br /> Personnel and Area Monitoring Tasks and Frequency: Not Required <br /> Decontamination Procedures: Not Required <br /> If contact with contaminates are made the following,decontamination procedures will be as follows: <br /> Station 1: Segregated equipment drops; drop equipment onto plastic liner. <br /> Station 2: Boot cover,outer garment, and outer glove,wash/rinse and removal; wash and rinse boot <br /> covers and discard into plastic bag. Wash and rinse outer gloves with detergent water <br /> and rinse. Remove outer gloves and discard into plastic bag for disposal. <br /> Station 3: Remove Inner Gloves: Remove inner gloves and discard in plastic bag for disposal. Inner <br /> gloves will not be reused. <br /> Station 4: Field Wash: Wash hands and face with tap water. <br /> Station 5: Dress. <br /> Equipment Required: Two bristle brushes; two pressurized containers,one for TSP wash water and one for rinse <br /> water,plastic; containers for disposal of clothing and cartridges. Two tubs,one for TSP wash step and one for <br /> rinse step. <br /> Site Specific Training: Site worker documentation will show they meet the training requirements. ['29CFR <br /> 1910.120] Prior to starting fieldwork the Super./Forman shall brief site workers on contents of this HASP and <br /> hazards and control of temperature extreme. Each DCM employee shall sign HASP acknowledgment form,and <br /> site-specific training log attached to hasp. <br /> IL Site Specific Medical Requirements: Obtain pertinent MSDS's and Personnel Training Certificates. <br />