Laserfiche WebLink
ADDITIONAL ASSESSMENT WORKPLAN <br /> COLBERG BOAT WORKS <br /> APRIL 2001 <br /> The results of the investigation were documented in Apex's report titled Results of Subsurface <br /> Investigation dated August 21, 1997. Colberg has been monitored quarterly for petroleum. <br /> hydrocarbon constituents in the groundwater since July'1997. In September 1998, Apex <br /> submitted a remediation plan entitled Workplan for Pilot Test and Feasibility Analysis for <br /> removal of Hydrocarbons from groundwater. An Addendum to Workplan for Pilot Testing and <br /> Feasibility Analysis was resubmitted in January 1999. Prior to acceptance of the remediation s <br /> plan,the Co��unty requested a mass balance calculation to determine whether remediation was <br /> necessary. Iu April 1999, Apex submitted a report entitled Mass Balance for Remaining T'PH G. <br /> p � P <br /> Upon review,of the report, the County determined that the extent of contamination had not been <br /> `delineated east of MW-3. <br /> Based on the response of the County, Apex submitted a Workplan for Additional Subsurface <br /> Investigation and Site Characterization1999 dated June 9, 1999. On September 29, Apex <br /> I <br /> personnel izniplemented the Workplan and installed five geoprobes at the site to establish the 1 <br /> 'extent of petroleum impacted groundwater east of monitoring well MW-3. The data obtained <br /> 1.from the investigation was incorporated into a report entitled Estimated Mass of Petroleum <br /> 'Hydrocarbon Constituents Remaining in Groundwater, and submitted to the County on February <br /> 2000. <br /> ,GHH assumed consulting responsibility for the site in May 2000. The County responded to the <br /> lFebruary 2000 Apex report in February 2001 by requesting additional soil and groundwater <br /> 'investigation east of MW-3 and soil boring SB-21 as shown on Figure 2. The County letter is <br /> :included in Appendix A. <br /> i <br /> GObjective <br /> of <br /> ;im acted ound Y The objective of this Workplan is to present a scope of work which will evaluate the extent s <br /> water where it is currentl undefined on the eastern portion of the site. This <br /> ;Workplan addresses the areas of concern with a screening investigation consisting of six <br /> 4eoprobes to approximately 15-feet below ground surface (bgs). <br /> f�Soil and groundwater samples collected during the geoprobe investigation will be analyzed to <br /> E `1Aetermine the amount of hydrocarbons and oxygenates present at the site. Samples will be <br /> 'analyzed for;the presence of total petroleum hydrocarbons as gasoline (TPH G); benzene, toluene <br /> Methylbenzene, and xylenes (BTEX); 1,2-dichloroethane 1,2 (DCA); ethyl dibromide (EDS);and <br /> j oxygenated fuel additives including methyl-tertiary-butyl-ether (MTBE),D1PE, ETBE, TAME <br /> and TBA using EPA Methods 8015 Modified, 8020, and 8254B, respectively. <br /> Upon review and analyses of the screening investigation results, one to two additional <br /> k` groundwater monitoring wells may be installed to define the extent of impacted groundwater to <br /> , <br /> the east of MW-3 and provide repeatable sampling data points. <br /> ii <br /> 2 <br /> it <br /> �I <br />