Laserfiche WebLink
ADDITIONAL ASSESSMENT WORKPLAN <br /> J <br /> COLBERG(BOAT WORKS <br /> APRIL 2001x;1 <br /> IIl'r I <br /> PREPARATION OF WORKPLAN <br /> I; <br /> Firm Preps"'ring Workplan <br /> �GHH Engineering,Inc. <br /> $084 Old Auburn Road, Suite E <br /> Citrus Heights, California 95610 <br /> ,:YVorkplan Prepared by: <br /> h <br /> :This Workplan was prepared by GHH Engineering, Inc. Gary H. Hall, Principal Engineer,is the <br /> qualified person responsible for overseeing this project. This Workplan was written by Ms. Heidi <br /> D. Hubbard k:Geologist and reviewed for technical content by Mr. Thomas E. Ballard,Project <br /> Manager, and Mr. Hall. <br /> This Workplan was prepared to assist Colberg Boat Works in the evaluation of the site. If you <br /> Piave any questions or need additional information, please call the undersigned at (916) 723-7645. <br /> Thank you, <br /> Jhomas E. Ballard <br /> Project Manager <br /> i A ` <br /> !P ES 10 <br /> :Gary Hall, PE 5� <br /> Tresi ht c� <br /> E:\5143XHH\najkAAWP4-Ol.wpd w � � <br /> z' 11 <br /> jlpc Lynn Swanson <br /> Marty Hartzell, Regional Board .�� <br /> ; Q <br /> Je$rey Wong, San Joaquin County C w <br /> I <br /> I <br /> 1 <br /> i <br /> I <br /> 7 <br /> I <br /> ill <br /> Il - <br />