My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
3500 - Local Oversight Program
>
PR0545105
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 2:04:26 PM
Creation date
12/19/2019 2:01:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545105
PE
3528
FACILITY_ID
FA0003965
FACILITY_NAME
PG&E
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11702001
CURRENT_STATUS
02
SITE_LOCATION
4040 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rThe following record will be archived in IT's permanent project files: <br /> ' • Occupational Injuries and Illnesses - 5 years <br /> • Training (Hazardous Waste and Operations)) Current. <br /> k p , <br /> • Exposure Measurements (Hazardous Waste Operations) - 30 years <br /> • Medical Surveillance (Hazardous Waste Operations) - 30 years <br /> The following information will be included in the Daily Logs and Inspection Reports. <br /> • Specific zone <br /> • Number of employees in each area <br /> • Equipment being used in each area <br /> • First aid treatments <br /> • Special health and safety issues noted <br /> • -Daily tailgate safety meeting forms <br /> • SSHO signature and date <br /> 99.2 Addition of Guidance to the HASP <br /> During the course of the project, additional guidance for new`or unforeseen procedures may <br /> arise. The HSO may make additions to the HASP, based on input from contractors, IT <br /> personnel, the Project Coordinator, or his own observations. The IT PM will review and approve <br /> such additions-prior to their inclusion in the HASP. Copies of the additions will be distributed to <br /> personnel and contractors as appropriate. <br /> i <br /> 1 <br /> Y <br /> �. 11 <br /> SaCDP-N:1Com iliWWalaUbwedlPmjeclsWJ71778407,=doc <br /> 11-2 <br /> /1/7/00 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.