My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONITORING WELL INSTALLATION REPORT - SITE ASSESSMENT WORK PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
2211
>
2900 - Site Mitigation Program
>
PR0507398
>
ARCHIVED REPORTS_MONITORING WELL INSTALLATION REPORT - SITE ASSESSMENT WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 4:41:53 PM
Creation date
12/19/2019 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONITORING WELL INSTALLATION REPORT - SITE ASSESSMENT WORK PLAN
RECORD_ID
PR0507398
PE
2950
FACILITY_ID
FA0007748
FACILITY_NAME
CFN CARDLOCK FACILITY
STREET_NUMBER
2211
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11707050
CURRENT_STATUS
02
SITE_LOCATION
2211 N WILSON WAY
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 25 February 2005 <br /> ' AGE-NC Project No. 98-0500 <br /> Page 4 of 6 <br /> ' • Between 145 and 150 feet bsg to assess hydrologic unit six and <br /> • Between 195 and 200 feet bsg to assess the vertical extent of contaminated groundwater. <br /> Followinginstallation each well will be developed to maximize water flow into the well and <br /> � p <br /> ' minimize the amount of fine-grained sediment drawn into the well during bailing. Procedures for <br /> well installation and development are presented in Sections 3.2. <br /> ' Ground water monitoring and sampling of each newly installed ground water monitoring well will <br /> be conducted on a quarterly basis; ground water samples will be analyzed for: <br /> • Volatile organic compounds (VOCs) including benzene, toluene, ethyl-benzene, xylene <br /> (BTEX) and Fuel oxygenates including MTBE, tertiary-butyl alcohol (TBA), di-isopropyl <br /> ether(DIPE),ethyl tertiary-butyl ether(ETBE)and tertiary-amyl methyl ether(TAME),1,2- <br /> ' Dichloroethane (1,2-DCA), ethylene dibromide (EBD)by EPA Method 8020/8260 and <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015 Modified. <br /> Ground water sample collection procedures are described in Section 3.5. <br /> 2.3. REPORT PREPARATION <br /> ' Additional site investigation results, with conclusions and applicable recommendations, will be <br /> included in quarterly ground water monitoring reports. The report will include a description of work <br /> ' performed and the results of the soil/groundwater sampling and analysis; conclusions and <br /> recommendations will also be included.The report will be in a format acceptable to the CVRWQCB, <br /> ' and will be reviewed and signed by a California Professional Geologist. <br /> ' 3.0. PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> ' Registered Geologist. Procedures for well installation, well monitoring and sampling are outlined <br /> below: <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.