My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012580 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
8500
>
2600 - Land Use Program
>
QX-91-0006
>
SU0012580 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2019 9:18:14 AM
Creation date
12/20/2019 9:12:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012580
PE
2656
FACILITY_NAME
QX-91-0006
STREET_NUMBER
8500
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
APN
09345001, 09345005
ENTERED_DATE
10/2/2019 12:00:00 AM
SITE_LOCATION
8500 N WAVERLY RD
RECEIVED_DATE
9/30/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Previously Approved Conditions of Approval <br /> Quarry Excavation Application No. QX-91-0006 Revisions of Approved Actions was approved by the <br /> Planning Commission on . The effective date of approval is . This approval will expire on <br /> which is 18 months from the date of approval, unless (1) all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been secured and remain in force, and (3) all <br /> necessary permits from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified; and, other ordinance requirements may <br /> apply. <br /> 1. DEVELOPMENT SERVICES DIVISION: <br /> Conditions of Approval: <br /> a. On July 11, 1991, the San Joaquin County Planning Commission approved QX-91-0006 <br /> subject to the approved conditions. All proposed excavation and rehabilitation shall be <br /> completed prior to the expiration of this permit in accordance with the application and <br /> reclamation plan. <br /> b. Plant operations shall not be carried on during the hours of 9:00 p.m. to 5:00 a.m., except <br /> during periods of declared national, stated or county emergency (Section 9-2244 <br /> C. A 100-foot set back is required from the natural swale and wetlands area. <br /> d. A 50-foot setback is required from the high water marks of the vernal pools shall be <br /> required. <br /> e. No excavation shall take place within twenty-five(25)feet of any property line or right-of-way <br /> (nor within the allowed slopes adjacent to said twenty-five (25) foot setback), unless the <br /> elevation prior to excavation is more than that of the abutting property, in which case the <br /> elevation within said twenty-five (25) foot setback shall at no time be less than that of the <br /> abutting property, at the property line. (Development Title Section 9-1415.30]) <br /> f. The maximum daily truck trips shall be 100. <br /> g. The plant and the open pit shall not be visible from Waverly Road. This shall be <br /> accomplished by berms and landscaping. (Section 9-2244 (o)). <br /> h. No stockpiled soil or material shall be placed closer than 25 feet to a property boundary <br /> (Section 9-2244 (b)). <br /> i. All private roads shall be maintained to control the creation of dust. <br /> j. Any night lighting established on the property shall be arranged and controlled to not <br /> illuminate public rights-of-way or adjacent properties (Section 9-2244 (g)). <br /> k. The topsoil shall be set aside, and upon completion of an excavation, the topsoil shall be <br /> replaced and the site leveled in conformance with the excavation permit (Section 9-2244 <br /> (i)). <br /> I. Slopes shall not exceed two feet horizontal to one foot vertical. <br /> M. The applicant shall pay a fee to the County of San Joaquin to cover the cost of periodic <br /> inspection of the excavation to ensure compliance with the provisions of the permit and <br /> administration of SMARA requirements (Section 9-2244 (s)). <br /> Planning Commission Staff Report, Item# 1 12/19/2019-QX-91-0006 (QE, RAA) 2 <br /> Previously Approved Conditions of Approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.