Laserfiche WebLink
e, K <br /> 2) Provide identification signs for the parking space(s)including the'tow away-sign. <br /> at each entrance or vsible from each space(C.C.R.. TWe 24). <br /> 3) The slope of a parking space shall not exceed 1/4 inch per foot(C.C.R.,Title 24). <br /> 5. STATE RECLAMATION BOARD: <br /> a. A Reclamation Board permit shall be required for and prior to the start of arty work within <br /> the Stockton DrvertkV Canal project ftoodway and levees within ten (10) feet landward <br /> of the Iandside Wm toes. (Section 8710 of cite CaW nia water Coda) <br /> I � • <br /> Y <br /> t <br /> !A <br /> t< <br /> -4- <br />