Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-95-23 <br /> 3 . The owner shall execute an Irrevocable Offer and Agreement <br /> to Dedicate Road to result in a fifty-five (55) foot wide <br /> right-of-way from the centerline of Wilson Way to the property <br /> line across the parcel's frontage. (A $225 .00 fee currently is <br /> required for processing per Development Title Table 9-240 .2 in <br /> addition to a copy of the Grant Deed. ) <br /> (Development Title Sections 9-1150 .2 and 9-1150 .5) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of building <br /> permit application. (The fee currently is $197.91 per daily <br /> trip-end generated in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record. ) A credit for the previous use will be allowed if it can <br /> be verified that it was in legal operation since April 23, 1990 . <br /> (Resolutions R-90-304, R-91-1025, R-93-167 and R-94-174) <br /> S . The Water Supply Facilities Impact Mitigation Fee will be required <br /> for this development. The fee is due and payable prior to <br /> issuance of the building permit. The fee currently is $288 per <br /> 1, 000 gross square foot of building as Retail Service. The fee <br /> shall be automatically increased on January 1 of each year through <br /> the year 2005 at the rate of 7.66 percent. <br /> (Development Title Section 9-818 .4 and Resolution R-91-327) <br /> TMI :lt <br /> P3-5G196.C6 <br /> E: Manuel Lopez, Deputy Director/Development <br />